CityGA
Jul 30, 2026
Closes
Aug 18, 2026
Historic Downtown Valdosta Paver Repair, Root Trimming & Resetting Project RFP
Repair, realign and reset brick and concrete pavers throughout the public sidewalks, plazas, and pedestrian ways of Historic Downtown. Scope of work includes field survey, root management, paver removal and repair, paver resetting, ADA and trip hazard compliance, joint and edge restoration, debris removal and site cleanup, traffic control and pedestrian safety, protection of adjacent property.