FederalMD
Aug 6, 2026
Closes
Aug 31, 2026
NIST Boulder Building 4 Generator and ATS Replacement
The removal and replacement of the existing standby emergency generator and Automatic Transfer Switch (ATS) serving Building 4. The contractor shall provide all labor, materials, equipment, supervision, and incidentals necessary to remove the existing generator and ATS, furnish and install a new standby emergency generator (with natural gas and diesel options) and compatible ATS, perform all associated electrical modifications, conduit and wiring installation, testing, commissioning, and documentation.