Mountain Rd and I-81 SB Ramp Int Signal RFP
The project includes the installation of a new traffic signal and other miscellaneous construction.
Description: This project provides for the improvement of Nisqually Road Southwest from the Nisqually River to the I-5 Northbound Ramp. The work includes resurfacing the existing asphalt pavement and paved shoulder, replacing existing substandard guardrail, and installing new guardrail. It also includes other work in accordance with the Plans and Specifications.
County · WA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Pierce County.
Adjacent opportunities open for bidding right now.
Pennsylvania Department of Transportation
State AgencyPA
Posted
Aug 17, 2026
Sep 17, 2026
The project includes the installation of a new traffic signal and other miscellaneous construction.
CountyMT
Posted
Aug 21, 2026
Sep 3, 2026
Project consists of replacing the existing bridge with 2 precast reinforced concrete box (RCB) culverts, approx., 4 miles. The first proposed structure will replace an existing corrugated-metal pipe (CMP) culvert with an 8-foot span by 7-foot rise precast RCB culvert with precast sloped-end walls. The second proposed structure will take the place of the existing stock pass underneath the road bridge and be a 6-foot span by 7' rise RCB culvert with sloped-end walls to act as a new stock pass and overflow drainage culvert. Both these structures will require bedding, structural backfill, a new roadway surface, detour road construction and removal, and associated work.
CityCO
Posted
-
Oct 5, 2026
The solicitation seeks a traffic study for the I-25 interchange and Harmony Road/Weld County Road 74 regional corridor. The study will evaluate current and future traffic conditions, identify multimodal needs, and develop a phased implementation plan with concepts and costs to guide future investment. It will examine the corridor from Fort Collins to Eaton, including the approximately 2.5-mile segment from Strauss Cabin Road to County Road 5, along with broader regional traffic connections.
CityCO
Posted
Aug 27, 2026
Oct 5, 2026
The City of Fort Collins is managing a joint request for qualifications with the Town of Timnath for a regional traffic study of the I-25 interchange and Harmony Road/Weld County Road 74 corridor. The study covers the corridor from Strauss Cabin Road to County Road 5, including Harmony Road and Weitzel Street, the I-25 interchanges, and related Carpenter Road/State Highway 392 and Prospect Road/Weld County Road 80 corridors. The work is intended to produce short-, medium-, and long-term improvement recommendations and possible initial design efforts, funded by $200,000 contributions from each municipality.