Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Upper Colorado Regional Office
The principal components of work for the Block 2-3 HDD include, but are not limited to, the following: HDD for 42" buried water transmission pipeline crossing; HDD for 36" buried water transmission pipeline crossings.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Upper Colorado Regional Office
The principal components of work for Block 2-3 Horizontal Directional Drilling (HOD) include, Provide: HOD for 42" buried water transmission pipeline crossing: Reach 2 : approx. 3,295-foot HOD bore length. HOD for 36" buried water transmission pipeline crossings: Reach 2 approx. 2,000-foot HOD bore length, approx. 2,400-FT HOD bore length. Approx. 2,080-FT HOD bore length.
Posted Date
Sep 29, 2025
Due Date
Jan 28, 2026
Release: Sep 29, 2025
Upper Colorado Regional Office
Close: Jan 28, 2026
The principal components of work for Block 2-3 Horizontal Directional Drilling (HOD) include, Provide: HOD for 42" buried water transmission pipeline crossing: Reach 2 : approx. 3,295-foot HOD bore length. HOD for 36" buried water transmission pipeline crossings: Reach 2 approx. 2,000-foot HOD bore length, approx. 2,400-FT HOD bore length. Approx. 2,080-FT HOD bore length.
AvailableUpper Colorado Regional Office
Construct new pumping plant: sitework, including cement-bentonite cutoff wall. Steel manifold piping, including connection to existing ductile iron line pipe. Metal building system and foundations. Cast-in-place concrete building structures. Vertical turbine pumping units. Air chambers. Electrical system. SCADA system. Water quality monitoring equipment. Demolition of existing pumping plant.
Posted Date
Jun 10, 2025
Due Date
Jan 16, 2026
Release: Jun 10, 2025
Upper Colorado Regional Office
Close: Jan 16, 2026
Construct new pumping plant: sitework, including cement-bentonite cutoff wall. Steel manifold piping, including connection to existing ductile iron line pipe. Metal building system and foundations. Cast-in-place concrete building structures. Vertical turbine pumping units. Air chambers. Electrical system. SCADA system. Water quality monitoring equipment. Demolition of existing pumping plant.
AvailableCity of Falls City
Sale of Property - Block 11 Lot 3. The total acres are 0.115
Posted Date
Nov 14, 2025
Due Date
Dec 10, 2025
Release: Nov 14, 2025
City of Falls City
Close: Dec 10, 2025
Sale of Property - Block 11 Lot 3. The total acres are 0.115
AvailableGeorgetown County Water And Sewer District
Work includes construction of the new red hill water interconnect 16-inch hdd line b consisting of the following quantities: approx 3,016 LF of 16" HDPE water main installed by horizontal directional drill and associated appurtenances.
Posted Date
Oct 22, 2025
Due Date
Nov 25, 2025
Release: Oct 22, 2025
Georgetown County Water And Sewer District
Close: Nov 25, 2025
Work includes construction of the new red hill water interconnect 16-inch hdd line b consisting of the following quantities: approx 3,016 LF of 16" HDPE water main installed by horizontal directional drill and associated appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis