Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The principal components of work for Block 2-3 Horizontal Directional Drilling (HOD) include, Provide: HOD for 42" buried water transmission pipeline crossing: Reach 2 : approx. 3,295-foot HOD bore length. HOD for 36" buried water transmission pipeline crossings: Reach 2 approx. 2,000-foot HOD bore length, approx. 2,400-FT HOD bore length. Approx. 2,080-FT HOD bore length.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The principal components of work for the Block 2-3 HDD include, but are not limited to, the following: HDD for 42" buried water transmission pipeline crossing; HDD for 36" buried water transmission pipeline crossings.
Posted Date
Oct 6, 2025
Due Date
Feb 25, 2026
Release: Oct 6, 2025
Close: Feb 25, 2026
The principal components of work for the Block 2-3 HDD include, but are not limited to, the following: HDD for 42" buried water transmission pipeline crossing; HDD for 36" buried water transmission pipeline crossings.
AvailableConstruct new pumping plant: sitework, including cement-bentonite cutoff wall. Steel manifold piping, including connection to existing ductile iron line pipe. Metal building system and foundations. Cast-in-place concrete building structures. Vertical turbine pumping units. Air chambers. Electrical system. SCADA system. Water quality monitoring equipment. Demolition of existing pumping plant.
Posted Date
Jun 10, 2025
Due Date
Jan 16, 2026
Release: Jun 10, 2025
Close: Jan 16, 2026
Construct new pumping plant: sitework, including cement-bentonite cutoff wall. Steel manifold piping, including connection to existing ductile iron line pipe. Metal building system and foundations. Cast-in-place concrete building structures. Vertical turbine pumping units. Air chambers. Electrical system. SCADA system. Water quality monitoring equipment. Demolition of existing pumping plant.
AvailableBlock Level Lead Service Line Replacements.
Posted Date
Dec 11, 2025
Due Date
Feb 10, 2026
Release: Dec 11, 2025
Close: Feb 10, 2026
Block Level Lead Service Line Replacements.
AvailableBlock level lead service line replacements.
Posted Date
Dec 11, 2025
Due Date
Feb 3, 2026
Release: Dec 11, 2025
Close: Feb 3, 2026
Block level lead service line replacements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →