Bridge reconstruction.
Description: Work includes new district office data installation project.
SchoolDistrict · CA, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
398 days before RFP
Staff reported a $30.6 million facilities-planning balance including the district-office purchase, tenant improvements and moving costs.
what we've done is we've consolidated the facilities planning um line item of the committed fund balance. So, taking away the 3 million that the board had previously committed for the Anna Education Center remodel and moving it into facilities planning and also increasing the facilities planning um line item to accommodate the purchase of the district…
RUSD Board of Education Meeting
Board meeting · Sep 25, 2025
Board meeting
146 days before RFP
RUSD's 2026-27 budget presentation planned $2.5 million for the new Iowa district office project.
uh we are plan have some planned expenses in 2627 to include um funds in there for um the Iowa the new district office project $2.5 million for the
Riverside Unified School District Board of Education Board Meeting
Board meeting · Jun 4, 2026
Board meeting
125 days before RFP
The Board approved terminating the Inland Regional Center lease at 1500 Iowa Avenue to support district-office consolidation and possession of the space.
Okay. Next, our next action item is to ratify an amendment to a lease with the Inland Regional Center. And this item will also be will be presented by Assistant Superintendent Williams. Good evening again. Uh provided uh for the board's consideration is the termination of a tenant lease at the new district office on Iowa Avenue. Uh it's held by the Inland…
Board meeting
41 days before RFP
RUSD reported that the new district office was being prepared for Phase 1 occupancy in February 2027 and Phase 2 occupancy in August 2027 using one-time unrestricted general-fund dollars.
Another project that we're working on is the new district office. Um, the department locations have all been settled. Uh, we actually are working on occupancy of the first portion. Uh, phase one would be, we believe, estimated in February of 27 2027 and then also phase two would be the following August of 2027. Uh we're working on that and uh making good…
Riverside Unified School District Board Of Education Board Meeting
Board meeting · Sep 17, 2026
RFP published
Proposals due (Closed)
Riverside Unified School Board of Education Board Meeting
Board meeting · Jun 25, 2026
These related opportunities are still open for bidding.
CountyIL
Posted
Nov 12, 2026
Dec 3, 2026
Bridge reconstruction.
North Dakota Mill and Elevator Association
State AgencyND
Posted
Nov 6, 2026
Dec 3, 2026
Project includes Phase 1: The final installation of an owner provided 2250 kW, 2813 kVA, 480Y/277V Cummins diesel generator and sub-base fuel tank and an owner provided 2500 kVA step-up transformer, 480Y/277V to 4160V Delta. The project would include all conduit, conductors, and control conductors for a complete generator installation for automatic peak reduction as needed. The generator, sub-base fuel tank and an owner provided transformer have been installed in a previous project, but the conductor installation and final programming has not been completed. Phase 2: The installation of an owner provided 2250 kW, 2813 kVA, 480Y/277V Cummins diesel generator and sub-base fuel tank and an owner provided 2500 kVA step-up transformer, 480Y/277V to 4160V Delta. The project would include all conduit, conductors, and control conductors for a complete generator installation for automatic peak reduction as needed. The concrete pad for the generator and transformer shall be included by the electrical contractor for the Phase 2 portion of the project.
CityNJ
Posted
-
Nov 24, 2026
Replacement of approx. 4,660 LF of 4", 6", and 8" asbestos cement and ductile iron pipe with 8" cement lined ductile iron pipe (CLDIP). Additionally, the project includes an alternate bid to install approx. 1,435 LF of 8"h CLDIP. A second alternate bid to install approx. 1,395 LF of 8" CLDIP is also included.
Special DistrictCA
Posted
Nov 5, 2025
Dec 3, 2026
Work includes approx. 5,377 LF of 6" Pipe burst polyethelyne slip lined sewer main with 6" HDPE; 8,290 LF of 8" pipe burst slip lined sewer main with 8" HDPE; 294 EA of pipe burst 4" lower lateral with 4" HDPE.