Indigenous GovernmentFL
Posted
Nov 5, 2026
Nov 23, 2026
Generator Installation (Brighton) RFP
Requesting bids from qualified contractors to provide standby generator installation services needed at the Brighton Reservation.
Description: Project includes Phase 1: The final installation of an owner provided 2250 kW, 2813 kVA, 480Y/277V Cummins diesel generator and sub-base fuel tank and an owner provided 2500 kVA step-up transformer, 480Y/277V to 4160V Delta. The project would include all conduit, conductors, and control conductors for a complete generator installation for automatic peak reduction as needed. The generator, sub-base fuel tank and an owner provided transformer have been installed in a previous project, but the conductor installation and final programming has not been completed. Phase 2: The installation of an owner provided 2250 kW, 2813 kVA, 480Y/277V Cummins diesel generator and sub-base fuel tank and an owner provided 2500 kVA step-up transformer, 480Y/277V to 4160V Delta. The project would include all conduit, conductors, and control conductors for a complete generator installation for automatic peak reduction as needed. The concrete pad for the generator and transformer shall be included by the electrical contractor for the Phase 2 portion of the project.
StateAgency · ND, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from North Dakota Mill and Elevator Association.
Adjacent opportunities open for bidding right now.
Indigenous GovernmentFL
Posted
Nov 5, 2026
Nov 23, 2026
Requesting bids from qualified contractors to provide standby generator installation services needed at the Brighton Reservation.
CityTX
Posted
Oct 1, 2026
Nov 19, 2026
Supply and installation of 10 manual transfer switches and two mobile generators.
CountyPA
Posted
Sep 29, 2026
Nov 16, 2026
Supply and installation of an emergency backup generator system.
CountyFL
Posted
Oct 29, 2026
Nov 18, 2026
Installation of a provided generator at Lift Station 874 (Meadows) in Placida, Florida.