North Dakota Mill and Elevator Association
State AgencyND
Posted
Nov 6, 2026
Dec 3, 2026
Generator Installation Project RFP
Project includes Phase 1: The final installation of an owner provided 2250 kW, 2813 kVA, 480Y/277V Cummins diesel generator and sub-base fuel tank and an owner provided 2500 kVA step-up transformer, 480Y/277V to 4160V Delta. The project would include all conduit, conductors, and control conductors for a complete generator installation for automatic peak reduction as needed. The generator, sub-base fuel tank and an owner provided transformer have been installed in a previous project, but the conductor installation and final programming has not been completed. Phase 2: The installation of an owner provided 2250 kW, 2813 kVA, 480Y/277V Cummins diesel generator and sub-base fuel tank and an owner provided 2500 kVA step-up transformer, 480Y/277V to 4160V Delta. The project would include all conduit, conductors, and control conductors for a complete generator installation for automatic peak reduction as needed. The concrete pad for the generator and transformer shall be included by the electrical contractor for the Phase 2 portion of the project.