Posted
Sep 25, 2026
Oct 23, 2026
204 Great Bear Way Road Demolition
Demolition of the remaining building structure on the property.
Description: The Federal Highway Administration is soliciting sealed bids to rehabilitate approximately three-quarters of a mile of Buck Hill Road (Route 204) in Theodore Roosevelt National Park, including landslide remediation and expansion of the Buck Hill Overlook parking lot. Work includes roadway and guardrail replacement, deep subexcavation with geosynthetic reinforcement and drainage, and improvements to the parking area, sidewalks, culverts, signage, and accessible parking. This full-and-open invitation for bid includes a HUBZone preference, an estimated cost of $5 million to $10 million, and a bid deadline of November 3, 2026, at 2:00 p.m. MST.
Federal · CO, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from 6982AF Central Federal Lands Division.
Adjacent opportunities open for bidding right now.
Posted
Sep 25, 2026
Oct 23, 2026
Demolition of the remaining building structure on the property.
CityIN
Posted
-
Oct 29, 2026
Superstructure replacement project which consists of replacement of the deck, railings and approach slabs.
Posted
Sep 8, 2026
Nov 10, 2026
This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100’ span concrete bridges at the Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway and new bridge location to the north of the existing roadway and drainage crossing. The remaining 3R sections of the roadway will receive full depth reclamation (FDR) or removal of pavement, including all parking areas, followed by a 4-inch pavement overlay.
Posted
Mar 3, 2026
Mar 3, 2027
The U.S. Department of Transportation, Federal Highway Administration issued a presolicitation for the reconstruction of approximately 7.22 miles of asphalt pavement and replacement of existing culverts on Two Medicine Road near East Glacier Park, MT. The project includes the mill and overlay of two parking areas and is estimated to cost between $15,000,000 and $25,000,000. Completion of the project is tentatively scheduled for Fall 2027.