Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of removing and replacing the existing pipe through the dam and the headgate structure on the north side of the dam. The project will consist of minor structural concrete and grouting for the concrete collars to hold the proposed pipe in place. The existing concrete structures will remain.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
In-city dam rehabilitation at central park reservoir in central park.
Posted Date
Jan 12, 2026
Due Date
Feb 18, 2026
Release: Jan 12, 2026
Close: Feb 18, 2026
In-city dam rehabilitation at central park reservoir in central park.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction services for the Augusta Reservoir Dam Improvement Project (Utilities Department). Procurement requires sealed bids (no email), bid documents obtained exclusively from Augusta Blueprint (non-refundable $100 fee), mandatory pre-bid conference and mandatory site visit, 5% bid bond on submission, 100% performance and payment bonds on award, Georgia E-Verify compliance for contractors/subcontractors, bids non-withdrawable for 90 days, and in-person bid opening with a Teams viewing option.
Posted Date
Dec 4, 2025
Due Date
Jan 20, 2026
Release: Dec 4, 2025
Close: Jan 20, 2026
Construction services for the Augusta Reservoir Dam Improvement Project (Utilities Department). Procurement requires sealed bids (no email), bid documents obtained exclusively from Augusta Blueprint (non-refundable $100 fee), mandatory pre-bid conference and mandatory site visit, 5% bid bond on submission, 100% performance and payment bonds on award, Georgia E-Verify compliance for contractors/subcontractors, bids non-withdrawable for 90 days, and in-person bid opening with a Teams viewing option.
AvailableThis RFP is for construction services for the partial removal of the Springfield Reservoir Dam, including its appurtenances and accumulated sediment, and stream channel restoration.
Posted Date
Jan 5, 2026
Due Date
Feb 17, 2026
Release: Jan 5, 2026
Close: Feb 17, 2026
This RFP is for construction services for the partial removal of the Springfield Reservoir Dam, including its appurtenances and accumulated sediment, and stream channel restoration.
AvailableThe project generally consists of construction of a new low-level outlet works structure and emergency spillway channel. Strip and stockpile topsoil and incidental grubbing. Demolition and site preparation. Embankment excavation. Borrow and place embankment fill. Furnish and place aggregate base course. Furnish and place 12" D50 riprap. Furnish and install 12"-diameter PVC outlet pipe and pipe cradle. Furnish and install outlet works precast concrete intake structure, outlet works manhole, and outlet structure.
Posted Date
Dec 26, 2025
Due Date
Feb 27, 2026
Release: Dec 26, 2025
Close: Feb 27, 2026
The project generally consists of construction of a new low-level outlet works structure and emergency spillway channel. Strip and stockpile topsoil and incidental grubbing. Demolition and site preparation. Embankment excavation. Borrow and place embankment fill. Furnish and place aggregate base course. Furnish and place 12" D50 riprap. Furnish and install 12"-diameter PVC outlet pipe and pipe cradle. Furnish and install outlet works precast concrete intake structure, outlet works manhole, and outlet structure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →