Nantucket Public School District
School DistrictMA
Mar 12, 2026
Closes
Aug 19, 2026
Nantucket Public Schools Modular Administration Building (Request For Proposal)
Work includes construction services for construction/installation of new modular office; design and fabrication of modular units; construction of foundations, on site drainage and backfill; provision and expense of all temporary utility and sanitary facilities at the project site. ; finish grading and removal of all debris from the site; all repairs and corrective work required by applicable warranties;; foundations, or concrete footings, anchoring, and skirting; exterior stairs, entrance ramps, and corridors; floors: joists, bottom board, insulation, subflooring, weight load capacity, and floor coverings; walls: studs, insulation, composition, siding, weight load capacity, wind load capacity, ceiling height, sound proofing, and interior finishes. See attached file.