Story Road Culvert Replacement *RE-BID*
Project consists of culvert replacement project.
Description: The work will include approx 2,100 LF of 8" Ductile Iron Pipe Cl 52 Water Main, Fittings, & Joints; 240 LF of 4" Ductile Iron Pipe Cl 52 Water Main, Fittings, & Joints; 1 LS of 8" HDPE Casing Pipe 4" HDPE Horizontal Directional bore; Excavation; 5 EA of Utility Pole Bracing System (If and Where Directed); 2 EA of 1" Water Service, Complete -Customer Side (Reconnect to Existing Curb Box).
City · NJ, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Borough of Hampton.
Adjacent opportunities open for bidding right now.
CityOH
-
Closes
Sep 4, 2026
Project consists of culvert replacement project.
CountyPA
-
Closes
Sep 4, 2026
Seeking qualified companies for a network edge switch replacement. Qty 6: catalyst 9200l 48-port poe+, 4 x 10g, network essentials; qty 6: cisco catalyst 9200l stack module; qty 6: c9200l cisco dna essentials, 48-port, 3 year term license.
CitySC
Jul 29, 2026
Closes
Sep 15, 2026
Seeking a qualified mechanical (plumbing) contractor to evaluate, design, and implement improvements to the domestic water service and distribution system. The objective of this project is to identify and correct deficiencies affecting water flow, pressure, and overall system performance throughout the facility.
CityCA
-
Closes
Sep 25, 2026
The work includes removing and replacing sanitary sewer mains, connecting sewer laterals to the new sanitary sewer main, removing and replacing sanitary sewer manholes, and connecting storm drain fly lines to the new sanitary sewer manholes. All surface improvements impacted by the work shall be restored, including but not limited to the street, sidewalk, curb, gutter, and median per city and district standards. 2,200 LF pre-installation cleaning and video inspection of sanitary sewer main line; 2,200 LF post-installation video of completed sanitary sewer main line; 300 LF replace existing 14" vcp sewer with 15" pvc via open trench (including reconnection of lateral); 790 LF replace existing 14" or 18" vcp sewer with 18" pvc via open trench (including reconnection of lateral). See outside link.