Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes removing and replacing sanitary sewer mains, connecting sewer laterals to the new sanitary sewer main, removing and replacing sanitary sewer manholes, and connecting storm drain fly lines to the new sanitary sewer manholes. All surface improvements impacted by the work shall be restored, including but not limited to the street, sidewalk, curb, gutter, and median per city and district standards. 2,200 lf pre-installation cleaning and video inspection of sanitary sewer main line; 2,200 lf post-installation video of completed sanitary sewer main line; 300 lf replace existing 14-inch vcp sewer with 15-inch pvc via open trench (including reconnection of lateral); 790 lf replace existing 14-inch or 18-inch vcp sewer with 18-inch pvc via open trench (including reconnection of lateral). See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of sewer line replacement.
Posted Date
Dec 12, 2025
Due Date
Jan 13, 2026
Release: Dec 12, 2025
Close: Jan 13, 2026
Project consists of sewer line replacement.
AvailableProjects consist of 350 LF removal of existing sewer and construct 8" PVC SDR-35 pipe sewer; 105 LF furnish and install 8" dia SDR-35 PVC sewer; 1,500 LF furnish and install 10" dia SDR-35 PVC sewer; 122 LF furnish and install 8" dia PVC SDR-35 sewer within 18" inner diameter steel casing; 2,400 LF abandon and cap existing sewer main; 17 EA furnish and install 48" dia manhole; 23 EA reconnect sewer lateral services; 1 LS post-construction CCTV inspection of sewer main; 122 LF jack/bore 18" inner diameter steel casing; 1 LS replace traffic striping, pavement markings. See attached file
Posted Date
Dec 9, 2025
Due Date
Jan 14, 2026
Release: Dec 9, 2025
Close: Jan 14, 2026
Projects consist of 350 LF removal of existing sewer and construct 8" PVC SDR-35 pipe sewer; 105 LF furnish and install 8" dia SDR-35 PVC sewer; 1,500 LF furnish and install 10" dia SDR-35 PVC sewer; 122 LF furnish and install 8" dia PVC SDR-35 sewer within 18" inner diameter steel casing; 2,400 LF abandon and cap existing sewer main; 17 EA furnish and install 48" dia manhole; 23 EA reconnect sewer lateral services; 1 LS post-construction CCTV inspection of sewer main; 122 LF jack/bore 18" inner diameter steel casing; 1 LS replace traffic striping, pavement markings. See attached file
Provide Bristol Drive Sanitary Sewer Replacement project.
Posted Date
Dec 24, 2025
Due Date
Jan 13, 2026
Release: Dec 24, 2025
Close: Jan 13, 2026
Provide Bristol Drive Sanitary Sewer Replacement project.
AvailableThe purpose of this project is for the reconstruction of the sewer lines, which will include the demolition, construction and replacement of the existing sewer lines placed along 6th Street and the sewer lines.
Posted Date
Dec 8, 2025
Due Date
Jan 26, 2026
Release: Dec 8, 2025
Close: Jan 26, 2026
The purpose of this project is for the reconstruction of the sewer lines, which will include the demolition, construction and replacement of the existing sewer lines placed along 6th Street and the sewer lines.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis