Open RFP

Evergreen/Winchester/Templeton Sewer Replacement Project *RE-BID*

Description: The work includes removing and replacing sanitary sewer mains, connecting sewer laterals to the new sanitary sewer main, removing and replacing sanitary sewer manholes, and connecting storm drain fly lines to the new sanitary sewer manholes. All surface improvements impacted by the work shall be restored, including but not limited to the street, sidewalk, curb, gutter, and median per city and district standards. 2,200 LF pre-installation cleaning and video inspection of sanitary sewer main line; 2,200 LF post-installation video of completed sanitary sewer main line; 300 LF replace existing 14" vcp sewer with 15" pvc via open trench (including reconnection of lateral); 790 LF replace existing 14" or 18" vcp sewer with 18" pvc via open trench (including reconnection of lateral). See outside link.

Buyer
City of Daly City

City · CA, US

Released
-
Closes
Sep 25, 2026(27 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts