FederalNM
Jul 31, 2026
Closes
Sep 1, 2026
Building 1055 Chiller Replacement
The removal and replacement of the existing chiller to include new piping, valves, electrical, and a complete flush and fill of the hydronic system at Building 1055, 2251.
Description: Includes, but is not limited to, the following major items: Removal of existing chiller, furnish and install new chiller along with valves, gauges, isolators, insulation, tanks, pumps, controls, and all associated electrical work.
City · OH, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalThese related opportunities are still open for bidding.
FederalNM
Jul 31, 2026
Closes
Sep 1, 2026
The removal and replacement of the existing chiller to include new piping, valves, electrical, and a complete flush and fill of the hydronic system at Building 1055, 2251.
Aug 19, 2026
Closes
Aug 31, 2026
For building 4 chiller replacement.
CityPA
Aug 20, 2026
Closes
Sep 17, 2026
Removal of existing heating and air conditioning equipment, and replacement with new heating and air conditioning equipment, including all labor, equipment, materials, and all other associated work
FederalVA
Aug 6, 2026
Closes
Aug 31, 2026
Removal and replacement of building 35 chiller.
Procurement and program contacts connected to City of Springboro.