Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Missouri Department of Transportation (MoDOT) Central District issued a single-feasible-source solicitation (Opportunity ID MODOT-FY25-0032-SL) seeking Multilink Intelligent Transportation Systems and related traffic products; MoboTrex, Inc. is named as the sole authorized supplier. The contract period listed is March 1, 2026 through February 28, 2027 and the work will be performed in Missouri. Bids are due 2026-01-27 and the posting date is 2026-01-21.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This Request for Qualifications (RFQ) seeks proposals for the design and construction of Intelligent Transportation Systems (ITS) Infrastructure for the East and West Selmon Project, including an upgraded lighting system and roadway improvements such as pavement resurfacing and rumble strip placement.
Posted Date
Jan 8, 2026
Due Date
Feb 6, 2026
Release: Jan 8, 2026
Close: Feb 6, 2026
This Request for Qualifications (RFQ) seeks proposals for the design and construction of Intelligent Transportation Systems (ITS) Infrastructure for the East and West Selmon Project, including an upgraded lighting system and roadway improvements such as pavement resurfacing and rumble strip placement.
AvailableThe Tampa‑Hillsborough County Expressway Authority (THEA) is soliciting Expanded Letters of Response (ELOR) under an RFQ for a phased design‑build project to deliver Intelligent Transportation Systems (ITS) infrastructure along the East and West Selmon corridors. The scope includes deployment of ITS technologies such as CCTV, MVD, RSUs, and DMS to improve operations, safety, incident management, and data‑driven decision‑making across the Selmon Expressway. A mandatory pre‑bid conference is scheduled for January 28, 2026 and responses are due March 2, 2026 at 5:00 PM Eastern.
Posted Date
Jan 8, 2026
Due Date
Mar 2, 2026
Provide intelligent transportation system (its) equipment (upc 107058). The equipment includes closed-circuit television (CCTV) cameras, network switches and traffic signal malfunction monitoring units.
Posted Date
Dec 8, 2025
Due Date
Feb 10, 2026
Release: Dec 8, 2025
Close: Feb 10, 2026
Provide intelligent transportation system (its) equipment (upc 107058). The equipment includes closed-circuit television (CCTV) cameras, network switches and traffic signal malfunction monitoring units.
AvailableProvision of research to develop CMFs for ITS infrastructure and applications on roadways and develop a method to incorporate the CMFs into safety performance and investment analyses.
Posted Date
Dec 18, 2025
Due Date
Feb 10, 2026
Release: Dec 18, 2025
Close: Feb 10, 2026
Provision of research to develop CMFs for ITS infrastructure and applications on roadways and develop a method to incorporate the CMFs into safety performance and investment analyses.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Tampa‑Hillsborough County Expressway Authority (THEA) is soliciting Expanded Letters of Response (ELOR) under an RFQ for a phased design‑build project to deliver Intelligent Transportation Systems (ITS) infrastructure along the East and West Selmon corridors. The scope includes deployment of ITS technologies such as CCTV, MVD, RSUs, and DMS to improve operations, safety, incident management, and data‑driven decision‑making across the Selmon Expressway. A mandatory pre‑bid conference is scheduled for January 28, 2026 and responses are due March 2, 2026 at 5:00 PM Eastern.