Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Millard Public Schools
The project consists of the replacement of the HVAC temperature controls.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Clay County District Schools
Elementary school fire alarm replacement.
Posted Date
Nov 13, 2025
Due Date
Dec 11, 2025
Release: Nov 13, 2025
Clay County District Schools
Close: Dec 11, 2025
Elementary school fire alarm replacement.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Clay County District Schools
Elementary school fire alarm replacement.
Posted Date
Nov 13, 2025
Due Date
Dec 11, 2025
Release: Nov 13, 2025
Clay County District Schools
Close: Dec 11, 2025
Elementary school fire alarm replacement.
AvailableJefferson County Public Schools
Project consists of a central plant replacement at Elementary School. The existing gas-fired hot water boilers and chiller will be replaced and the existing piping will be reworked to support these replacements. The electrical scope is also limited to supporting these replacements.
Posted Date
Nov 24, 2025
Due Date
Dec 12, 2025
Release: Nov 24, 2025
Jefferson County Public Schools
Close: Dec 12, 2025
Project consists of a central plant replacement at Elementary School. The existing gas-fired hot water boilers and chiller will be replaced and the existing piping will be reworked to support these replacements. The electrical scope is also limited to supporting these replacements.
AvailableThomasville City School District
Roof replacement Bldg. 100 (+/- 38,000 SF): Two roofs in place. Remove two roof assemblies down to original zonolite lightweight insulating vermiculite fill over metal formdeck. Install new temporary roof, lightweight insulating cellular concrete (LWIC) fill with insulporm rigid insulation board and fleece-back single ply membrane adhered to LWIC. 2. Roof recover Bldgs. 200, 201, 202, 300 & 400 Gym (+/- 16,100 SF): One single ply roof assembly in place. Existing roof to remain. Install new single ply assembly consisting of rigid insulation board, cover board and single ply membrane (adhered). Coverboard mechanically attached to existing structural metal deck. 3. Install overflow roof drains and storm drain piping at Bldg. 100.
Posted Date
Nov 12, 2025
Due Date
Dec 9, 2025
Release: Nov 12, 2025
Thomasville City School District
Close: Dec 9, 2025
Roof replacement Bldg. 100 (+/- 38,000 SF): Two roofs in place. Remove two roof assemblies down to original zonolite lightweight insulating vermiculite fill over metal formdeck. Install new temporary roof, lightweight insulating cellular concrete (LWIC) fill with insulporm rigid insulation board and fleece-back single ply membrane adhered to LWIC. 2. Roof recover Bldgs. 200, 201, 202, 300 & 400 Gym (+/- 16,100 SF): One single ply roof assembly in place. Existing roof to remain. Install new single ply assembly consisting of rigid insulation board, cover board and single ply membrane (adhered). Coverboard mechanically attached to existing structural metal deck. 3. Install overflow roof drains and storm drain piping at Bldg. 100.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →