Summary
Work approx 1,610 LF of 24" ductile iron water pipe; approx 7,920 LF of 30" high density polyethylene water pipe; approx 40 LF of 12" polyvinyl chloride water pipe; approx 9,110 LF of trench excavation safety, ten 30" gate valves with manhole and bonnet box; three 24" gate valves with manhole and bonnet box; four blow-off valves with manhole; one 2" air release valve with manhole; four 3" combination air release vacuum valve with manhole; one 3" air release valve with manhole; one 4" combination air release vacuum valve with manhole; one 72" access manway; approx 460 LF 48" diameter steel casing by boring methods, approx 90 LF of 60" diameter fiberglass casing by open cut methods; approx 60 SY of removal and repair concrete pavement; approx 14,320 SY of crushed stone base course if needed; removal and replacement of landscaping and irrigation improvements in E.P.E.C. property; cathodic protection system; traffic control for TXDOT and county right-of-way; and videotaping of project site before and after construction.