Summary
Construct approx. 5,600 LF of 12" water main adjacent. Work includes clearing and grubbing within the LOD, installation of ductile iron and PVC water main, fittings, valves, hydrants, air release valves, and a meter vault; trench excavation, bedding, backfill, and compaction; stream and wetland crossings including trench plugs and concrete encasement where required; utility coordination and protection; erosion and sediment control measures; testing, disinfection, and restoration of pavements, driveways, and disturbed areas; and all appurtenant work required for a complete and operational water main extension.