CountyFL
Posted
Sep 29, 2026
Nov 5, 2026
River Beach Drive Vehicular Beach Access Ramp Reconstruction Project (Invitation for Bid)
Work inlcudes vehicular beach access ramp.
Description: Mitigation reconstruction of a flood prone home project. The proposed project consists of the installation of one new elevated manufactured home on a manufactured home park lot where the existing home has been removed by the City under a separate contract. The original home measured approx. 24' by 52' (1,248 SF of heated living area). The replacement structure shall be installed on a permanent foundation and shall not exceed 110% of the original square footage, resulting in a maximum allowable size of 1,372 SF inclusive of any lifts and landings, in accordance with FEMA Hazard Mitigation Grant Program (HMGP) requirements.
City · FL, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CountyFL
Posted
Sep 29, 2026
Nov 5, 2026
Work inlcudes vehicular beach access ramp.
Oak Harbor School District 201
School DistrictWA
Posted
Oct 8, 2026
Oct 29, 2026
Work consists of adding mechanical cooling and sound control window assemblies, and replacing ceilings and portions of ceilings. The Hillcrest Elementary School Noise Mitigation project is an effort to reduce aircraft noise in the teaching spaces of the school. The project will include adding mechanical cooling to the building, adding acoustical windows, and replacing ceilings in locations indicated. The addition of cooling will require installation of a cooling water piping, and the addition of a chiller and chiller yard. Alternate 1 - classroom floors, alternate 2 - classroom lighting, alternate 3 - classroom ceiling tiles.
Skagit County Public Utility District 1
Special DistrictWA
Posted
Sep 23, 2026
Oct 28, 2026
Installation of a new water supply well in a flowing aquifer system to replace an existing well. The replacement well will be drilled and tested under the authority of the existing water right (G1-05743). The replacement well will be constructed using 12" steel casing to a maximum depth of 300 feet. The goal is to provide a well that can produce the full quantity of their existing water right. The installation will include, but not be limited to, a flow-control seal, well drilling, screen installation, well development, pump testing, and a sanitary seal.
Las Virgenes Muncipal Water Dist
Special DistrictCA
Posted
-
Oct 23, 2026
Tank rehabilitation project. Work includes - 9,700 SF Interior Coating – per Section 09 97 13.13, Total Removal - Shell, Floor, Column, and Rafter; 3,000 SF Interior Coating – per Section 09 97 13.13, Total Removal - Roof; see attached file.
Decision makers connected to this RFP from City of Port Orange.