CityCA
Posted
Sep 1, 2026
Sep 24, 2026
Yorba Linda Boulevard and Mountain View Avenue Storm Drain Replacement Project
Work includes approx. of 146 LF of remove existing CMP and construct 48" RCP (D-4000); 5,050 SF of 2" asphalt concrete grind and overlay; 120 LF of furnish and install 1" schedule 40 PVC irrigation lateral line, including required fittings; 70 LF of furnish and install 1 1/2" schedule 40 PVC irrigation mainline, including required fittings; 82 LF of furnish and install 14-gauge direct-burial irrigation control wire, six (6) conductors, approximately 82 LF EA.