Work includes 2,043 TON aggregate shoulder borrow; 28,698 SY milling asphalt pavement, depth (1-1/2); 3,282 SY incidental milling; 1,964 ton asphalt conc surface course, type s9.5b; 8,609 TON asphalt conc surface course, type s9.5c; 695 ton asphalt binder for plant mix; 1,260 TON patching existing pavement; 60 LF 2'-6" concrete curb & gutter; 1 EA remove and replace concrete curb ramps; 4 EA adjustment of drop inlets; 18 EA adjustment of manholes; 45 EA adjustment of meter boxes or valve boxes. See attached file.