Special DistrictAR
Posted
-
Nov 5, 2026
Water Treatment Plant SCADA Improvements Main. RFP
Procurement of SCADA improvements for the Water Treatment Plant.
Description: emoval of all existing equipment, supply and install SCADA Remote Terminal Units, PLC's, Cellular LTE Modems, Panel Enclosures, HMI units, Main Terminal Unit, design engineering, and programming for a complete SCADA unit. Installation includes all terminal, antennae wiring, and electrical work. The Alternate Bid scope includes: - A cellular signal survey at each site. Temporary electrical boxes will house the antennas and modems during the survey, so antenna locations can be tested and moved as needed before permanent installation. - Supply and installation of the cellular LTE modems, antennae and mounting, cabling, enclosures, and surge protection, with the associated conduit and wiring. - Configuration of a secure network between the remote sites and the central station. - Configuration of the existing equipment to communicate over the new network. - Cutover with minimal disruption of service, removal of the leased-line equipment, and testing and documentation.
City · NJ, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
Special DistrictAR
Posted
-
Nov 5, 2026
Procurement of SCADA improvements for the Water Treatment Plant.
CountyOH
Posted
Nov 2, 2026
Nov 18, 2026
Provide Lift Station SCADA Improvements.
CityGA
Posted
Oct 29, 2026
Dec 3, 2026
This request is for a proposal to furnish all equipment, materials, and installation services to perform all services necessary for control and monitoring system improvements complete with all appurtenances and accessories to be installed at the City of Carrollton Water Treatment Plant. Currently the City¿s Water Plant operates ten conventional filters. Each filter has six individual valves; left influent, right influent, effluent, drain, wash and rewash, and a shared backwash valve for a total of 61 valves. These valves are controlled using a DeviceNet communication network and two Allen-Bradley ControlLogix PLCs with Panelview touchscreens. DeviceNet is no longer a widely used communication network and has proven more and more difficult for the city to support and maintain throughout the years. The purpose of this project is to abandon the existing DeviceNet based valve control system in lieu of simpler valve controls utilizing conventional discrete and analog wiring. Furthermore, it is the design intent that each filter will be capable of standalone control without the need of the Supervisory ControlLogix PLCs. Each filter will have its own dedicated Allen-Bradley PLC and touchscreen. Additionally, the integrator will replace the plant¿s existing SCADA system with new HMI software and computer hardware. Proposals shall include all materials, labor, applicable taxes and fees including freight to Carrollton, Georgia.
CityNC
Posted
Oct 28, 2026
Dec 2, 2026
The Town of Clayton is seeking proposals to develop a master plan for its water, sewer, and electric SCADA systems. The notice describes the work as development of that plan but provides no further scope, budget, or project-length details. Responses are submitted through the North Carolina electronic Vendor Portal.
Decision makers connected to this RFP from Borough of Milford.