Special DistrictCA
Posted
Oct 29, 2026
Dec 10, 2026
Bollman Water Treatment Plant Improvements RFP
Water treatment plant improvements.
Description: Procurement of SCADA improvements for the Water Treatment Plant.
SpecialDistrict · AR, US
Decision makers connected to this RFP from West Memphis Utilities.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
Special DistrictCA
Posted
Oct 29, 2026
Dec 10, 2026
Water treatment plant improvements.
CityOK
Posted
Oct 14, 2026
Nov 18, 2026
Scope consists of 1 LS chemical system improvements; 9 EA 36" motorized actuator; 3 EA 60" motorized actuator; 4 EA 36" butterfly valve, mj.
CityOK
Posted
Oct 15, 2026
Nov 16, 2026
2 Ea treatment unit; 1 LS PEMB structure and foundation; 1 Ea clearwell; 1 LS decanter system; 2 Ea backwash/residual holding tank; 1 LS waste lift station; 1 LS influent submersible pumps and piping with valve vault; 1 LS package grinder pump station; 1 LS mixing vault; 1 LS bleach injection vault; 1 LS effluent injection vault; 1 LS sampling vault; 1 Ea generator with concrete pad; 1 LS ATS and electrical improvements; 190 LF of 8" water main, PVC C900 DR18; 180 LF of 6" water main, PVC C900 DR18; 75 LF of 12" sewer main, PVC C900 SDR26; 104 LF of 8" sewer main, PVC C900 SDR26; 4 LF of 4" sewer main, PVC C900 SDR26; 55 LF of 4" force main, PE SDR 11; 1,082 LF of 2" force main, PE SDR 11; 1 Ea standard manhole, 5-10 LF deep; 2,010 SY of 6" thick gravel surface; 620 LF of 6' chain link fencing w/climb barrier; 1 Ea of 24' wide dbl leaf gate; 500 CY embankment; 35 CY unclassified excavation; 1 LS hydrostatic pressure test and disinfection; 1 LS mobilization; 1 LS erosion control.
CityIL
Posted
Oct 16, 2026
Dec 2, 2026
Division A: Water Treatment Plant The work consists of a new 300 gallon per minute treatment plant with filtration systems, chemical feed systems, pumps, controls, site piping, and building. Work will also include upgrades to the electrical systems and the addition of a generator at the well field. The work shall include all labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to perform the project as set forth in the Contract Documents. Division B: Route 130 Water Main Extension The work consists of furnishing and installing water piping, fittings, valves, hydrants, services, connections, disconnections, and appurtenances for potable water. Installation will consist of 6” PVC RJ Yelomine HDD and 6” PVC SDR-21 Water Main along design route. This work also includes surface restoration. The work shall include all labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to perform the project as set forth in the Contract Documents.