CityCA
Posted
Sep 18, 2026
Oct 14, 2026
Cherry Avenue Sewer Improvement Project
Work consists of the installation of around 3,100 lf of vitrified clay pipe (VCP) or high density polyethylene (HDPE) sewer line along with 12 new 48" maintenance holes and 1 new 60" drop sewer maintenance hole. The Work also includes removal and replacement or abandonment of existing sewer lines and manholes. Also included are dewatering, sewer flow bypassing, post-construction video inspection, pavement removal and replacement, trenching, backfilling and compacting.
