Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct approx 3,700 LF of new 18" ductile iron transmission main.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 9, 2026
Release: Nov 17, 2025
Close:
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
AvailableWork inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 9, 2026
Release: Nov 17, 2025
Close: Jan 9, 2026
Work inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
AvailableThe City of Riverton, Wyoming is requesting qualifications from engineering/consulting firms for the West Main Street Water Transmission Line Project. Statements of qualifications are due by 4:00 p.m. Mountain Time on January 7, 2026; questions are accepted until 4:00 p.m. on Tuesday, December 30. Specifications and communications are handled via the Public Purchase portal as indicated by the city’s notice.
Posted Date
Dec 13, 2025
Due Date
Jan 7, 2026
Release: Dec 13, 2025
Close: Jan 7, 2026
The City of Riverton, Wyoming is requesting qualifications from engineering/consulting firms for the West Main Street Water Transmission Line Project. Statements of qualifications are due by 4:00 p.m. Mountain Time on January 7, 2026; questions are accepted until 4:00 p.m. on Tuesday, December 30. Specifications and communications are handled via the Public Purchase portal as indicated by the city’s notice.
AvailableProject contemplated consists of a new 16" ductile iron transmission main and 10" ductile watermain and includes asphalt and concrete restoration and associated water valves, fittings, services, and relevant appurtenances.
Posted Date
Nov 26, 2025
Due Date
Jan 15, 2026
Release: Nov 26, 2025
Close: Jan 15, 2026
Project contemplated consists of a new 16" ductile iron transmission main and 10" ductile watermain and includes asphalt and concrete restoration and associated water valves, fittings, services, and relevant appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →