Raw Water Transmission Main RFP
Posted
Nov 4, 2026
Dec 2, 2026
The installation of approx. 27,000 LF of 18" (DR 11) HDPE and 36,000 LF of 16" (DR 13.5) HDPE. Construction will include the installation of air release assemblies, valving, directional creek bores, directional highway bores, and system connections.