Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes but is not limited to a new wastewater pretreatment system, a new wastewater pretreatment building, and relocation of an existing access road. The new wastewater pretreatment system includes a new lift station, screening, dissolved air floatation (DAF) system, chemical storage and handling systems, DAF float storage and handling systems, and electrical distribution systems. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The WW Word Printing Update is a request for quotation (RFQ) issued by the Procurement, Veteran's Services department. This RFQ replaces RFQ #SCH-25-Q-003 in its entirety.
Posted Date
Oct 17, 2024
Due Date
Dec 31, 2099
Release: Oct 17, 2024
Close: Dec 31, 2099
The WW Word Printing Update is a request for quotation (RFQ) issued by the Procurement, Veteran's Services department. This RFQ replaces RFQ #SCH-25-Q-003 in its entirety.
AvailableProject includes the following Work: Construction, test pumping, and sampling of an 18-inch diameter potable municipal sandstone well. Construction of 70-foot x 52-foot water treatment building with cast-in-place concrete foundation and floors, masonry walls, concrete plank ceiling and membrane roof; buried cast-in-place concrete detention tank; FRP and hollow metal doors and frames; louvers; plumbing; heating; ventilation; painting; interior and exterior lighting; electrical; process instrumentation and control; supervisory control and data acquisition (SCADA) system improvements; standby generator and automatic transfer switch; vertical turbine well pump, vertical turbine high lift pumps; process mechanical piping, valves, flowmeters, and appurtenances. Site work including 14-inch diameter water main and valves; 8-inch diameter sanitary sewer piping and associated manholes; two (2) 12,000-gallon nominal capacity buried precast concrete backwash detention tanks; site grading; concrete stoops and sidewalk; aggregate base course and asphalt pavement for driveway and parking areas; removal and reinstallation of existing chain link fence; erosion control; street restoration; and site restoration. All work shall be awarded under a single contract. Treatment equipment will be bid out in a separate bid package (Phase 2) after well construction has been completed. The anticipated substantial completion date is August 2027, and final completion date is May 2028.
Posted Date
Dec 23, 2025
Due Date
Jan 21, 2026
This Request for Bids from the San Francisco Public Utilities Commission is for construction work on the WW-719CR Folsom Area Stormwater Improvements (Harrison/Treat box sewers and connecting auxiliary sewers) and requires bidders to be pre-qualified by SFPUC. The posting lists an estimated cost (~$160,000,000) and a bid submission deadline of January 22, 2026 at 2:00 PM local time.
Posted Date
Oct 24, 2025
Due Date
Jan 22, 2026
Release: Oct 24, 2025
Close: Jan 22, 2026
This Request for Bids from the San Francisco Public Utilities Commission is for construction work on the WW-719CR Folsom Area Stormwater Improvements (Harrison/Treat box sewers and connecting auxiliary sewers) and requires bidders to be pre-qualified by SFPUC. The posting lists an estimated cost (~$160,000,000) and a bid submission deadline of January 22, 2026 at 2:00 PM local time.
Pre-qualification for general contractors to undertake electrical upgrades at the Freund House pump station, including replacement of the Motor Control Center, medium voltage transformers, automatic transfer switch, Variable Frequency Drives, switchgear troubleshooting and installation, power system studies, and new electrical infrastructure.
Posted Date
Nov 24, 2025
Due Date
Jan 15, 2026
Release: Nov 24, 2025
Close: Jan 15, 2026
Pre-qualification for general contractors to undertake electrical upgrades at the Freund House pump station, including replacement of the Motor Control Center, medium voltage transformers, automatic transfer switch, Variable Frequency Drives, switchgear troubleshooting and installation, power system studies, and new electrical infrastructure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Close: Jan 21, 2026
Project includes the following Work: Construction, test pumping, and sampling of an 18-inch diameter potable municipal sandstone well. Construction of 70-foot x 52-foot water treatment building with cast-in-place concrete foundation and floors, masonry walls, concrete plank ceiling and membrane roof; buried cast-in-place concrete detention tank; FRP and hollow metal doors and frames; louvers; plumbing; heating; ventilation; painting; interior and exterior lighting; electrical; process instrumentation and control; supervisory control and data acquisition (SCADA) system improvements; standby generator and automatic transfer switch; vertical turbine well pump, vertical turbine high lift pumps; process mechanical piping, valves, flowmeters, and appurtenances. Site work including 14-inch diameter water main and valves; 8-inch diameter sanitary sewer piping and associated manholes; two (2) 12,000-gallon nominal capacity buried precast concrete backwash detention tanks; site grading; concrete stoops and sidewalk; aggregate base course and asphalt pavement for driveway and parking areas; removal and reinstallation of existing chain link fence; erosion control; street restoration; and site restoration. All work shall be awarded under a single contract. Treatment equipment will be bid out in a separate bid package (Phase 2) after well construction has been completed. The anticipated substantial completion date is August 2027, and final completion date is May 2028.
Available