Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pre-qualification for general contractors to undertake electrical upgrades at the Freund House pump station, including replacement of the Motor Control Center, medium voltage transformers, automatic transfer switch, Variable Frequency Drives, switchgear troubleshooting and installation, power system studies, and new electrical infrastructure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consist of the installation: upgrades inside the pump station shall include replacement of the motor control center (mcc) and associated medium voltage transformers, demolition/abandonment of older systems affected by the replacement of the mcc; reconnection of low voltages equipment to the new motor control center; addition of an automatic transfer switch upstream of new mcc; replacement of existing four variable frequency drives for the 600hp pumps; contractor to troubleshoot the existing switchgear to resolve the "power- flicker" issue; contractor shall implement solution where switchgear transfer scheme controller responds to single-phase and three-phase events on the vepco system. See attached file.
Posted Date
Nov 24, 2025
Due Date
Jan 15, 2026
Release: Nov 24, 2025
Close:
Premium
Access the largest public sector contact database
Project consist of the installation: upgrades inside the pump station shall include replacement of the motor control center (mcc) and associated medium voltage transformers, demolition/abandonment of older systems affected by the replacement of the mcc; reconnection of low voltages equipment to the new motor control center; addition of an automatic transfer switch upstream of new mcc; replacement of existing four variable frequency drives for the 600hp pumps; contractor to troubleshoot the existing switchgear to resolve the "power- flicker" issue; contractor shall implement solution where switchgear transfer scheme controller responds to single-phase and three-phase events on the vepco system. See attached file.
AvailableFire house minor renovation project (bathroom upgrades).
Posted Date
Dec 9, 2025
Due Date
Dec 19, 2025
Release: Dec 9, 2025
Close: Dec 19, 2025
Fire house minor renovation project (bathroom upgrades).
AvailableProvide facilities modernization - HVAC and electrical upgrades project.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
Provide facilities modernization - HVAC and electrical upgrades project.
AvailableWork includes electrical upgrades & back up generator - electrical.
Posted Date
Nov 3, 2025
Due Date
Dec 17, 2025
Release: Nov 3, 2025
Close: Dec 17, 2025
Work includes electrical upgrades & back up generator - electrical.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis