Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Fairfax County
Project consist of the installation: upgrades inside the pump station shall include replacement of the motor control center (mcc) and associated medium voltage transformers, demolition/abandonment of older systems affected by the replacement of the mcc; reconnection of low voltages equipment to the new motor control center; addition of an automatic transfer switch upstream of new mcc; replacement of existing four variable frequency drives for the 600hp pumps; contractor to troubleshoot the existing switchgear to resolve the "power- flicker" issue; contractor shall implement solution where switchgear transfer scheme controller responds to single-phase and three-phase events on the vepco system. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Santa Cruz
The project scope of work generally includes the following: replace existing pg&e 21kv electric service, replace 21kv main switchgear, cables, and substations, complete 21kv loop to provide a redundant means of distributing power around the plant, replace existing 480v and 2. 4kv switchgear (including conversion of the 2. 4kv system to 480v). See attached file.
Posted Date
Nov 7, 2025
Due Date
Jan 15, 2026
Release: Nov 7, 2025
City of Santa Cruz
Close: Jan 15, 2026
The project scope of work generally includes the following: replace existing pg&e 21kv electric service, replace 21kv main switchgear, cables, and substations, complete 21kv loop to provide a redundant means of distributing power around the plant, replace existing 480v and 2. 4kv switchgear (including conversion of the 2. 4kv system to 480v). See attached file.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Santa Cruz
The project scope of work generally includes the following: replace existing pg&e 21kv electric service, replace 21kv main switchgear, cables, and substations, complete 21kv loop to provide a redundant means of distributing power around the plant, replace existing 480v and 2. 4kv switchgear (including conversion of the 2. 4kv system to 480v). See attached file.
Posted Date
Nov 7, 2025
Due Date
Jan 15, 2026
Release: Nov 7, 2025
City of Santa Cruz
Close: Jan 15, 2026
The project scope of work generally includes the following: replace existing pg&e 21kv electric service, replace 21kv main switchgear, cables, and substations, complete 21kv loop to provide a redundant means of distributing power around the plant, replace existing 480v and 2. 4kv switchgear (including conversion of the 2. 4kv system to 480v). See attached file.
AvailablePueblo Community College
Provide a complete design for the ada upgrades.
Posted Date
Dec 2, 2025
Due Date
Jan 15, 2026
Release: Dec 2, 2025
Pueblo Community College
Close: Jan 15, 2026
Provide a complete design for the ada upgrades.
AvailableTown of Avon
Request for Qualifications (RFQ) for the Avon Industrial Park Sewer Engineering Design, Permitting & Grant Support.
Posted Date
Nov 13, 2025
Due Date
Dec 12, 2025
Release: Nov 13, 2025
Town of Avon
Close: Dec 12, 2025
Request for Qualifications (RFQ) for the Avon Industrial Park Sewer Engineering Design, Permitting & Grant Support.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →