Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Pueblo Community College
Provide a complete design for the ada upgrades.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Fairfax County
Project consist of the installation: upgrades inside the pump station shall include replacement of the motor control center (mcc) and associated medium voltage transformers, demolition/abandonment of older systems affected by the replacement of the mcc; reconnection of low voltages equipment to the new motor control center; addition of an automatic transfer switch upstream of new mcc; replacement of existing four variable frequency drives for the 600hp pumps; contractor to troubleshoot the existing switchgear to resolve the "power- flicker" issue; contractor shall implement solution where switchgear transfer scheme controller responds to single-phase and three-phase events on the vepco system. See attached file.
Posted Date
Nov 24, 2025
Due Date
Jan 15, 2026
Release: Nov 24, 2025
Fairfax County
Close: Jan 15, 2026
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Project consist of the installation: upgrades inside the pump station shall include replacement of the motor control center (mcc) and associated medium voltage transformers, demolition/abandonment of older systems affected by the replacement of the mcc; reconnection of low voltages equipment to the new motor control center; addition of an automatic transfer switch upstream of new mcc; replacement of existing four variable frequency drives for the 600hp pumps; contractor to troubleshoot the existing switchgear to resolve the "power- flicker" issue; contractor shall implement solution where switchgear transfer scheme controller responds to single-phase and three-phase events on the vepco system. See attached file.
Foothill Transit Zone
DESIGN-BUILD. Provide design-build services and work for the Electric Bus Charging Station Upgrades.
Posted Date
Sep 12, 2025
Due Date
Dec 4, 2025
Release: Sep 12, 2025
Foothill Transit Zone
Close: Dec 4, 2025
DESIGN-BUILD. Provide design-build services and work for the Electric Bus Charging Station Upgrades.
Saint Paul Public Library
Seeking qualifications from qualified firms to furnish and install automated materials handling systems to replace existing 3m library sorters at various library locations. The selected proposer will provide design, equipment, installation, integration, and commissioning services to ensure seamless operation with the sppls sierra integrated library system (ils), existing rfid tags, and compliance with all city standards. This procurement will follow a two-step best value method (bvm) selection process as authorized by the city s procurement policy.
Posted Date
Oct 24, 2025
Due Date
Dec 4, 2025
Release: Oct 24, 2025
Saint Paul Public Library
Close: Dec 4, 2025
Seeking qualifications from qualified firms to furnish and install automated materials handling systems to replace existing 3m library sorters at various library locations. The selected proposer will provide design, equipment, installation, integration, and commissioning services to ensure seamless operation with the sppls sierra integrated library system (ils), existing rfid tags, and compliance with all city standards. This procurement will follow a two-step best value method (bvm) selection process as authorized by the city s procurement policy.
Saint Paul Public Library
Seeking qualifications from qualified firms to furnish and install automated materials handling systems to replace existing 3m library sorters at various library locations. The selected proposer will provide design, equipment, installation, integration, and commissioning services to ensure seamless operation with the sppls sierra integrated library system (ils), existing rfid tags, and compliance with all city standards. This procurement will follow a two-step best value method (bvm) selection process as authorized by the city s procurement policy.
Posted Date
Oct 24, 2025
Due Date
Dec 4, 2025
Release: Oct 24, 2025
Saint Paul Public Library
Close: Dec 4, 2025
Seeking qualifications from qualified firms to furnish and install automated materials handling systems to replace existing 3m library sorters at various library locations. The selected proposer will provide design, equipment, installation, integration, and commissioning services to ensure seamless operation with the sppls sierra integrated library system (ils), existing rfid tags, and compliance with all city standards. This procurement will follow a two-step best value method (bvm) selection process as authorized by the city s procurement policy.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →