Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
1,940 SY Hot mix asphalt concrete type D (3" compacted depth); 1,940 SY Asphalt treated base (ATB) (10" compacted depth); 1.940 SY Salvaging, hauling, & stockpiling reclaimable asphaltic pavement; 10 CY Topsoil; 50 SY Hydromulching; 60 LF Hot applied thermoplastic pavement markings (4" wide white line); 150 LF Trench excavation safety protection; 5,000 LF Sanitary sewer main television inspection. For the complete list, see page 24 of the attached specification.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of Construction Engineering Services (CES) for the Bass Lake Potable - Recycled Water Supplement Connection & Bridlewood Tank Rehabilitation Project, which includes tank rehabilitation and a potable-to-recycled water connection.
Posted Date
Dec 18, 2025
Due Date
Feb 3, 2026
Release: Dec 18, 2025
Close: Feb 3, 2026
Procurement of Construction Engineering Services (CES) for the Bass Lake Potable - Recycled Water Supplement Connection & Bridlewood Tank Rehabilitation Project, which includes tank rehabilitation and a potable-to-recycled water connection.
AvailableWork includes approx 10,231 LF of 8" PVC C900 DR18 water line pipe; 126 LF of 12" waterline bore without casing; 20 EA 12" gate valve awwa 509; 681 SY driveway repair (concrete). See outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 27, 2026
Release: Dec 3, 2025
Close: Jan 27, 2026
Work includes approx 10,231 LF of 8" PVC C900 DR18 water line pipe; 126 LF of 12" waterline bore without casing; 20 EA 12" gate valve awwa 509; 681 SY driveway repair (concrete). See outside link.
AvailableThis RFP seeks construction management and inspection professional services for the Bass Lake Potable - Recycled Water Supplement Connection & Bridlewood Tank Rehabilitation Project.
Posted Date
Dec 18, 2025
Due Date
Feb 2, 2026
Release: Dec 18, 2025
Close: Feb 2, 2026
This RFP seeks construction management and inspection professional services for the Bass Lake Potable - Recycled Water Supplement Connection & Bridlewood Tank Rehabilitation Project.
AvailableConstruction services for the Alder Creek Water Treatment Plant Upgrades, encompassing demolition, retrofit, and installation of various systems including membrane filtration, pump stations, chemical storage, and site infrastructure.
Posted Date
Nov 14, 2025
Due Date
Jan 15, 2026
Release: Nov 14, 2025
Close: Jan 15, 2026
Construction services for the Alder Creek Water Treatment Plant Upgrades, encompassing demolition, retrofit, and installation of various systems including membrane filtration, pump stations, chemical storage, and site infrastructure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis