Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction services for the Alder Creek Water Treatment Plant Upgrades, encompassing demolition, retrofit, and installation of various systems including membrane filtration, pump stations, chemical storage, and site infrastructure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Demolish existing filtration equipment, retrofit existing water treatment infrastructure, upgrade existing backwash pond, install owner-purchased low pressure membrane filtration system containers with supporting equipment and canopy structure, install raw water pump station upgrades, chemical storage and feed system, finished water pump station with curried clearwell, site grading, erosion control, civil site work and yard piping, stormwater improvements, electrical and instrumentation improvements, and install owner-purchased generator and switchboard.
Posted Date
Nov 17, 2025
Due Date
Jan 15, 2026
Release: Nov 17, 2025
Close: Jan 15, 2026
Demolish existing filtration equipment, retrofit existing water treatment infrastructure, upgrade existing backwash pond, install owner-purchased low pressure membrane filtration system containers with supporting equipment and canopy structure, install raw water pump station upgrades, chemical storage and feed system, finished water pump station with curried clearwell, site grading, erosion control, civil site work and yard piping, stormwater improvements, electrical and instrumentation improvements, and install owner-purchased generator and switchboard.
AvailableDesign and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
Posted Date
Dec 10, 2025
Due Date
Jan 23, 2026
Release: Dec 10, 2025
Close: Jan 23, 2026
Design and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
AvailableProvide Southwest Water Treatment Plant Upgrades and Treatment Improvement.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Provide Southwest Water Treatment Plant Upgrades and Treatment Improvement.
AvailableWater treatment plant solids upgrades.
Posted Date
Dec 30, 2025
Due Date
Feb 2, 2026
Release: Dec 30, 2025
Close: Feb 2, 2026
Water treatment plant solids upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis