Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 10,231 LF of 8" PVC C900 DR18 water line pipe; 126 LF of 12" waterline bore without casing; 20 EA 12" gate valve awwa 509; 681 SY driveway repair (concrete). See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailablePremium
Access the largest public sector contact database
Construction of the water line loop.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Construction of the water line loop.
AvailableWork consists of Waterline replacement pipe and tracer wire Pymatuning State Park. Includes 440 LF of 6" C-900 pipe, 20' lengths; 500' of tracer wire suitable for water line use.
Posted Date
Dec 9, 2025
Due Date
Dec 16, 2025
Release: Dec 9, 2025
Close: Dec 16, 2025
Work consists of Waterline replacement pipe and tracer wire Pymatuning State Park. Includes 440 LF of 6" C-900 pipe, 20' lengths; 500' of tracer wire suitable for water line use.
AvailableWork consists of Waterline replacement pipe and tracer wire Pymatuning State Park. Includes 440 LF of 6" C-900 pipe, 20' lengths; 500' of tracer wire suitable for water line use.
Posted Date
Dec 9, 2025
Due Date
Dec 16, 2025
Release: Dec 9, 2025
Close: Dec 16, 2025
Work consists of Waterline replacement pipe and tracer wire Pymatuning State Park. Includes 440 LF of 6" C-900 pipe, 20' lengths; 500' of tracer wire suitable for water line use.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis