Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
work includes approx 11,265 LF of water line; 310 LF of utility crossing/parallel installation; 290 LF of multiple bore and jacks, two directional bore, and other associated appurtenances and related work.
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
work includes approx 11,265 LF of water line; 310 LF of utility crossing/parallel installation; 290 LF of multiple bore and jacks, two directional bore, and other associated appurtenances and related work.
AvailablePremium
Access the largest public sector contact database
The major features of the Project generally involves the following: In-Town Water Line Replacement; Service Line and Meter Setting Replacement; Silver Run Water Line Replacement & Extension; High Street – Smith Hill Interconnection & Pressure Reducing Valve Installation; Valve Replacements; Fire Hydrant Replacement; Leak Detection Meter Installation; Pressure Reducing Valve Rehabilitation; Tank Cleaning, Inspection, and Rehabilitation.
Posted Date
Dec 9, 2025
Due Date
Dec 23, 2025
Release: Dec 9, 2025
Close: Dec 23, 2025
The major features of the Project generally involves the following: In-Town Water Line Replacement; Service Line and Meter Setting Replacement; Silver Run Water Line Replacement & Extension; High Street – Smith Hill Interconnection & Pressure Reducing Valve Installation; Valve Replacements; Fire Hydrant Replacement; Leak Detection Meter Installation; Pressure Reducing Valve Rehabilitation; Tank Cleaning, Inspection, and Rehabilitation.
AvailableThe U.S. Army Corps of Engineers, Pittsburgh District issued a Sources Sought notice to identify capable contractors for water system improvements in Town of Cairo (Cairo, Ritchie County, WV), including water line replacements, service line and meter setting replacement, pressure reducing valve station rehabilitation/installation, valve and fire hydrant replacements, leak detection meter installation, and water storage tank cleaning/inspection/rehabilitation. This is a Sources Sought (planning) notice — not a solicitation or grant — to gather capability statements and statements of intent to bid; no contract will be awarded based on this notice. Responses (planning inputs) were requested by 10:00 AM ET on 2025-12-23.
Posted Date
Dec 9, 2025
Due Date
Dec 23, 2025
Release: Dec 9, 2025
Close: Dec 23, 2025
The U.S. Army Corps of Engineers, Pittsburgh District issued a Sources Sought notice to identify capable contractors for water system improvements in Town of Cairo (Cairo, Ritchie County, WV), including water line replacements, service line and meter setting replacement, pressure reducing valve station rehabilitation/installation, valve and fire hydrant replacements, leak detection meter installation, and water storage tank cleaning/inspection/rehabilitation. This is a Sources Sought (planning) notice — not a solicitation or grant — to gather capability statements and statements of intent to bid; no contract will be awarded based on this notice. Responses (planning inputs) were requested by 10:00 AM ET on 2025-12-23.
AvailableProject consists of water system improvements.
Posted Date
Nov 30, 2025
Due Date
Dec 19, 2025
Release: Nov 30, 2025
Close: Dec 19, 2025
Project consists of water system improvements.