St Charles County Public Water Supply District 2
Special DistrictMO
Posted
Aug 25, 2026
Oct 15, 2026
Western Transmission Main Phase 3C
Provide western transmission main phase 3C. The scope of work for the project includes the construction of approx. 14,741 LF of 30" class 250 ductile iron water main, 337 LF of 30" restrained joint ductile iron pipe, approx. 50 LF of 42" steel casing installed by jack-and-bore methods, and connection to the existing water transmission system. The project also includes all associated appurtenances, including butterfly valves, fire hydrants, air release valves, fittings, testing, disinfection, restoration, and all incidental work necessary to provide a complete and operational water transmission main.