Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide mech rm hw/cw pump replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Department of Veterans Affairs issued a combined synopsis/solicitation for a comprehensive survey and replacement of non-potable hot water and chilled water pumps at the Washington DC VA Medical Center. The procurement was updated to a Total Small Business set-aside with a mandatory site visit scheduled for late January 2026. Proposals are due by January 30, 2026, and must be submitted via email to the primary point of contact.
Posted Date
Dec 10, 2025
Due Date
Jan 30, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Department of Veterans Affairs issued a combined synopsis/solicitation for a comprehensive survey and replacement of non-potable hot water and chilled water pumps at the Washington DC VA Medical Center. The procurement was updated to a Total Small Business set-aside with a mandatory site visit scheduled for late January 2026. Proposals are due by January 30, 2026, and must be submitted via email to the primary point of contact.
AvailableWork includes construction of water well pump replacement.
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Work includes construction of water well pump replacement.
AvailableProcurement of a vertical turbine pump replacement service for the Water Treatment Plant, including removal of the existing pump and installation of a new vertical turbine pump.
Posted Date
-
Due Date
Feb 13, 2026
Close: Feb 13, 2026
Procurement of a vertical turbine pump replacement service for the Water Treatment Plant, including removal of the existing pump and installation of a new vertical turbine pump.
AvailableThe scope of work generally consists of the complete demolition and replacement of wastewater pump station. The new pump station will provide a wet well sized to reduce pump cycling, and the new building will be cmu with brick face and will include a standing seam metal roof.
Posted Date
Jan 20, 2026
Due Date
Feb 20, 2026
Release: Jan 20, 2026
Close: Feb 20, 2026
The scope of work generally consists of the complete demolition and replacement of wastewater pump station. The new pump station will provide a wet well sized to reduce pump cycling, and the new building will be cmu with brick face and will include a standing seam metal roof.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →