CityPA
Posted
Oct 6, 2026
Oct 28, 2026
East Brady Borough Contract No. 25-WTP1 Water Treatment Plant Chemical Feed Improvements
Water treatment plant chemical feed improvements.
Description: Erosion and sedimentation controls; excavation; construction of foundation/footer system, building to house PFAS - granulated activated Carbon (GAC) (Anthracite based) treatment process equipment and suspended solids filter system, all interconnecting piping, isolation valves, check valves, transfer pumps, pipe supports, fasteners, and appurtenances. Building construction includes windows, doors, HVAC, plumbing, foundation drains, roof, rood leaders and downspouts, and access/parking and walkways. The contract also requires the existing wellhead piping to be rerouted from the existing ion exchange (IX) treatment system to the new GAC system and install the proposed GAC effluent piping to the existing IX treatment train, as depicted and described within the contract documents. As well as all necessary appurtenances and restoration for said construction.
SpecialDistrict · PA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityPA
Posted
Oct 6, 2026
Oct 28, 2026
Water treatment plant chemical feed improvements.
Martinsburg Municipal (Water And Sewer) Authority
Special DistrictPA
Posted
Oct 13, 2026
Nov 10, 2026
Improvements to the existing water distribution system which includes construction of a new welded steel spheroid 0.30 MG elevated storage tank with site improvements as well as cleaning and painting of the owners existing welded steel reservoir. Contract includes all general, mechanical, and electrical work required for job complete. And all necessary appurtenances and restoration for said construction.
CityIA
Posted
-
Oct 27, 2026
Water treatment plant street improvements project, includes construction of street, driveway and sidewalk on 3rd Avenue, 2nd Avenue, Main Street and State Street involving surface removals, grading, storm sewer work, manhole replacement, subgrade preparation, modified subbase, and PCC paving as well as lighting installation and electrical system improvements, general restoration, seeding and cleanup. The work involves just under 7 blocks of reconstruction.
CityGA
Posted
Sep 30, 2026
Oct 21, 2026
This project will support the modernization and reliability of process control, monitoring, and automation functions essential to plant operations. The City is seeking qualified firms with demonstrated experience in SCADA system upgrades, integration with existing water treatment processes, and implementation of new control system components. Replace obsolete control system hardware (including discontinued ControlLogix PLCs, Remote I/O systems, PanelView OITs, and Flex I/O components) with new 5580 series PLCs, Flex 5000 I/O, update communication modules, and new enclosures where required. Upgrade all plant-wide control networks, removing legacy ControlNet cabling, taps, and bridges, and replacing them with Ethernet/IP networks using device‑level rings (DLR), multimode fiber, and updated Cisco industrial switches. Replace the existing iFix SCADA HMI system with AVEVA System Platform, including updated HMI screens, workstation configurations, communication settings, and tag database modifications necessary for new hardware.