Special DistrictCA
Posted
Oct 26, 2026
Nov 24, 2026
Facility LED Lighting Retrofit (Request for Proposal))
Replace existing lighting systems with high-efficiency LED lighting and lighting controls.
Description: Like-for-like replacement of the existing, largely fluorescent- and compact fluorescent-based, luminaires throughout the basement, first, second, third, fourth, and fifth levels, with new led-type luminaires. Luminaire types, quantities, and approximate locations are identified on these drawings. Some areas, including mechanical rooms and areas where recent renovations have been performed, are excluded from this scope of work.
HigherEducation · MN, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalThese related opportunities are still open for bidding.
Special DistrictCA
Posted
Oct 26, 2026
Nov 24, 2026
Replace existing lighting systems with high-efficiency LED lighting and lighting controls.
CityWI
Posted
-
Dec 17, 2026
The City of Madison is soliciting bids for a public-works retrofit of the Central Library’s book-stack lighting and controls to improve lighting and reduce energy and maintenance costs. Work includes removing and replacing the lighting and controls, integrating Network Lighting Controls (Athena), delegated controls design, permits and inspections, and closeout items such as training, as-built drawings, warranties, and spare parts. Construction must be completed within three months after on-site work begins, and construction closeout is due no later than eight months after the start-work letter.
Everman Independent School District
School DistrictTX
Posted
Oct 29, 2026
Nov 19, 2026
Provide a complete outdoor led sports-lighting system with minimum maintained average horizontal illumination of 50 foot-candles infield and 30 foot-candles outfield at the playing surface. See attached file.
Minnesota State University Mankato
Higher EducationMN
Posted
-
Dec 4, 2026
Project Scope: The current Gymnasium Divider Curtains were installed in 2000. They have exceeded their expected life and have started to fail. This project will remove the existing curtains, operating hardware, and motors and replace with new gym divider curtains. The curtains that are scheduled to be replaced include the two round sections and the two straight sections of curtains that align with the inside edge of the track. It will also include the three court divider curtains. The curtain system should be replaced to match the existing design of the dividers including layout, materials operation, and motor locations. We will be adding curtain locks to all sections of the curtain. Contractor shall provide floor protection for areas that lifts will be operated on. Protection shall consist of a slip sheet, and 2 layers of ¾” plywood. Prevailing wage rates will be required on this project. The project will be constructed in one phase. Minnesota State will hold a VOLUNTARY In-Person informational meeting on Tuesday November 24, at 9:00 am, at Myers Field House Conference room 129 – visitor paid parking will be available in Lot 4 on the corner of South Road and Ellis Avenue, just South of the Student Union. Link to parking information: https://mankato.mnsu.edu/about-the-university/maps-and-transportation/parking/parking-and-traffic-guidelines/visitor-parking/
Decision makers connected to this RFP from Minnesota State University Mankato.