Closing soon

Mailbox Only - RFQ for Engineering Services for the Temperance Mill Ditch Pedestrian Bridge and Trail Project

Description: Services will include preparation of necessary plans, specifications, estimates, and conducting necessary utility coordination for the project. In general, the Consultant shall be qualified and able to provide the list of services: Participate in coordination meetings with City staff and with environmental consultant as needed. • Participate in key stakeholder’s meetings (City, FID, FMFCD, public, etc.). • Prepare utility notification letters to various utilities and agencies. • Preparation of Utility Communication Log to be completed and updated with every submittal, or upon request of City Project Management Team. • Lead the effort on utility relocations, including preparing and submitting required documents to various agencies. • Prepare and provide pothole exhibit based on utility research and engineers’ recommendations showing potential utility conflicts. • Conduct site investigation to prepare construction documents. • Process City provided topographic survey information. • Prepare and submit necessary documents to agencies for utility relocations. • Identify and prepare required right-of-way exhibits, deeds and maps showing required right-of-way acquisition. • Prepare appraisal maps detailing all permanent acquisitions and any Temporary Construction Easements. • Provide geotechnical services if required. • Provide structural engineering services as required. • Prepare construction plans, technical specifications, and construction cost estimates at each phase of work identified in the consultant agreement. • Submit construction documents to City office for stakeholder review. • Obtain final signatures on construction documents by City and stakeholders. • As part of the bidding phase, attend the pre-bid conference, prepare addenda and clarifications if necessary, and attend bid opening. • As part of the construction phase and general construction contract administration, attend the pre-construction conference, review shop drawings and other contractor submittals, provide clarification of construction documents during construction, review and provide technical information for construction contract change order requests if necessary, and perform as many as two site visits during construction. • Prepare record drawings documents using the as-built improvements. SEE REQUEST FOR QUALIFICATIONS (RFQ) FOR FULL DETAILS

Buyer
City of Fresno

City · CA, US

Released
Nov 20, 2026
Closes
Dec 9, 2026(12 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts