CityPA
Aug 13, 2026
Closes
Aug 31, 2026
Garretson Street Bridge Rehabilitation RFP
Install traffic control measures and all E&S Bmps. Perfom excavation of the existing roadway within the limits shown on the drawings. Remove existing bridge waterproofing membrane. Install new bridge waterproofing membrane. Install new roadway subbase. Install new asphalt. Restore / stabilize all disturbed areas and remove all of the erosion and sedimentation control devices.