Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pavement reconstruction within the road right-of-way. The scope of work also includes removal of existing sidewalks, installation of new raised concrete sidewalks and asphalt bike lanes, installation of new curb/gutters, removal/replacement of existing curb ramps and driveway aprons, installation of new pavement striping and markers, adjusting manholes/valves frames and covers where needed, removal/replacement of existing drainlines, waterlines and sewer lines, installation of new catch basins and drain manholes, and removal/replacement of signage and posts
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of construction: 1,439 LF 8" PVC water .ain; 77 LF 6" PVC Water Main; 7 EA 8" Valve & Box; 4EA 6" valve & box; 4 EA 6" hydrant, complete; 5008 SY remove pavement complete; 1590 SY 8" aggregate base; 627 TON HMA, 4EL, wearing 2" 942 TON HMA, 3EL, base 3"; 2LS traffic control; 2 LS pavement markings; 2 LS soil erosion and sedimentation control; 2 LS cleanup.
Posted Date
Dec 16, 2025
Due Date
Jan 22, 2026
Release: Dec 16, 2025
Close: Jan 22, 2026
Project consists of construction: 1,439 LF 8" PVC water .ain; 77 LF 6" PVC Water Main; 7 EA 8" Valve & Box; 4EA 6" valve & box; 4 EA 6" hydrant, complete; 5008 SY remove pavement complete; 1590 SY 8" aggregate base; 627 TON HMA, 4EL, wearing 2" 942 TON HMA, 3EL, base 3"; 2LS traffic control; 2 LS pavement markings; 2 LS soil erosion and sedimentation control; 2 LS cleanup.
AvailableConstruction of E. Elm Street Transmission Main Improvements, including installation of 1,250 LF of 16-inch and 70 LF of 8-inch C900 PVC water main, valves, fire hydrant assemblies, and E. Elm Street reconstruction involving HMA, crushed surfacing, and excavation.
Posted Date
Dec 17, 2025
Due Date
Jan 21, 2026
Release: Dec 17, 2025
Close: Jan 21, 2026
Construction of E. Elm Street Transmission Main Improvements, including installation of 1,250 LF of 16-inch and 70 LF of 8-inch C900 PVC water main, valves, fire hydrant assemblies, and E. Elm Street reconstruction involving HMA, crushed surfacing, and excavation.
AvailableThis Request for Bids is for the construction of bituminous sidewalk, granite curbing, shoulder reconstruction, pavement markings, signage, drainage improvements, landscaping, and other highway-related items.
Posted Date
Dec 23, 2025
Due Date
Jan 21, 2026
Release: Dec 23, 2025
Close: Jan 21, 2026
This Request for Bids is for the construction of bituminous sidewalk, granite curbing, shoulder reconstruction, pavement markings, signage, drainage improvements, landscaping, and other highway-related items.
AvailableWork includes 6,933 CY excavation, class 10; 16,665 SY subgrade preparation; 15,898 ton subgrade treatment, geogrid; 186 LF removal of known pipe and conduit, HDPE, 2"; 8,440 SY amended topsoil, 8"; 180 tn trench foundation; 370 CY replacement of unsuitable backfill material; 527 LF sanitary sewer gravity main, trenched, PVC, 8"; 70 LF sanitary sewer service stub, PVC, 6"; 530 LF removal of sanitary sewer, VCP 8"; 726 LF storm sewer, trenched, RCP, 15"; 266 LF storm sewer, trenched, RCP, 18"; 749 LF storm sewer, trenched, RCP, 24". See outside link.
Posted Date
Dec 17, 2025
Due Date
Jan 21, 2026
Release: Dec 17, 2025
Close: Jan 21, 2026
Work includes 6,933 CY excavation, class 10; 16,665 SY subgrade preparation; 15,898 ton subgrade treatment, geogrid; 186 LF removal of known pipe and conduit, HDPE, 2"; 8,440 SY amended topsoil, 8"; 180 tn trench foundation; 370 CY replacement of unsuitable backfill material; 527 LF sanitary sewer gravity main, trenched, PVC, 8"; 70 LF sanitary sewer service stub, PVC, 6"; 530 LF removal of sanitary sewer, VCP 8"; 726 LF storm sewer, trenched, RCP, 15"; 266 LF storm sewer, trenched, RCP, 18"; 749 LF storm sewer, trenched, RCP, 24". See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis