Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of E. Elm Street Transmission Main Improvements, including installation of 1,250 LF of 16-inch and 70 LF of 8-inch C900 PVC water main, valves, fire hydrant assemblies, and E. Elm Street reconstruction involving HMA, crushed surfacing, and excavation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Install 1,250 LF of 16" C900 PVC water main and 70 LF of 8" C900 PVC water main with valves and fire hydrant assemblies. Reconstruct East Elm Street including 650 tons HMA, 1,300 tons CSBC, 600 tons CSTC, and 1,200 CY unclassified excavation.
Posted Date
Dec 18, 2025
Due Date
Jan 21, 2026
Release: Dec 18, 2025
Close: Jan 21, 2026
Install 1,250 LF of 16" C900 PVC water main and 70 LF of 8" C900 PVC water main with valves and fire hydrant assemblies. Reconstruct East Elm Street including 650 tons HMA, 1,300 tons CSBC, 600 tons CSTC, and 1,200 CY unclassified excavation.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of Water Transmission Improvements, specifically +/- 2,318 LF of 30-inch RJ DIP Waterline and one tie-in to an existing 30-inch ductile iron water main.
Posted Date
-
Due Date
Jan 23, 2026
Close: Jan 23, 2026
Construction of Water Transmission Improvements, specifically +/- 2,318 LF of 30-inch RJ DIP Waterline and one tie-in to an existing 30-inch ductile iron water main.
AvailableRoadway, drainage, utility, and traffic signal improvements at the intersection in order to add a raised crosswalk.
Posted Date
Dec 11, 2025
Due Date
Jan 13, 2026
Release: Dec 11, 2025
Close: Jan 13, 2026
Roadway, drainage, utility, and traffic signal improvements at the intersection in order to add a raised crosswalk.
AvailableThe Town of Westford, Massachusetts is soliciting bids for intersection improvements at North Main Street and West Street. The project includes realignment of West Street, drainage work, ADA‑compliant curb ramps, sidewalks, curbing, paving, and other miscellaneous roadway work. Bids are due January 14, 2026 at 2:00 PM ET, and bid documents are available beginning December 17, 2025 via the Town’s website.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
The Town of Westford, Massachusetts is soliciting bids for intersection improvements at North Main Street and West Street. The project includes realignment of West Street, drainage work, ADA‑compliant curb ramps, sidewalks, curbing, paving, and other miscellaneous roadway work. Bids are due January 14, 2026 at 2:00 PM ET, and bid documents are available beginning December 17, 2025 via the Town’s website.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →