Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Bryson City
Construction and improvements along Main Street, east of the River Street/Main Street intersection, extending 1,300 LF, including erosion control; pedestrian and vehicular traffic control; demolition and removal of existing sidewalks, curbs, crosswalks, striping, street landscaping, and other existing infrastructure; sidewalk reconstruction; concrete curb; concrete islands; stamped concrete; on-street parking reconstruction; crosswalk realignment; driveway apron adjustments; curb ramps; concrete stormwater flumes and stormwater structure top modifications; electrical conduit and street light installation; vertical adjustments to utility appurtenances; installation of miscellaneous street furnishings and signage; and thermoplastic striping.
Posted Date
Apr 2, 2026
Due Date
Apr 21, 2026
Release: Apr 2, 2026
Town of Bryson City
Close: Apr 21, 2026
Construction and improvements along Main Street, east of the River Street/Main Street intersection, extending 1,300 LF, including erosion control; pedestrian and vehicular traffic control; demolition and removal of existing sidewalks, curbs, crosswalks, striping, street landscaping, and other existing infrastructure; sidewalk reconstruction; concrete curb; concrete islands; stamped concrete; on-street parking reconstruction; crosswalk realignment; driveway apron adjustments; curb ramps; concrete stormwater flumes and stormwater structure top modifications; electrical conduit and street light installation; vertical adjustments to utility appurtenances; installation of miscellaneous street furnishings and signage; and thermoplastic striping.
AvailableTown of Bryson City
The proposed project generally includes the expansion of wastewater treatment plant from 0.6 mgd to 0.9 mgd to include replacement of headworks consisting of dual mechanical bar screens each rated for 2. 7 mgd at peak hourly flow, an influent pump station (ips) consisting of three (3) 940 gpm pumps and a 400 kw emergency generator; installation of four (4) 210,000 gallons basin sequence batch reactor (sbr) with fine bubble diffusers and decanters with vfds, four (4) 110 gpm was pumps with vfds and three (3) 470 cfm blowers with vfds, a 2.7 mgd ultraviolet (uv) disinfection system with three banks in series and an electrical building; conversion of two (2) package wastewater treatment plants to aerated sludge holding tanks, installation of two 100 gpm digested sludge was pumps
Posted Date
Sep 8, 2025
Due Date
Oct 16, 2025
Release: Sep 8, 2025
Town of Bryson City
Close: Oct 16, 2025
The proposed project generally includes the expansion of wastewater treatment plant from 0.6 mgd to 0.9 mgd to include replacement of headworks consisting of dual mechanical bar screens each rated for 2. 7 mgd at peak hourly flow, an influent pump station (ips) consisting of three (3) 940 gpm pumps and a 400 kw emergency generator; installation of four (4) 210,000 gallons basin sequence batch reactor (sbr) with fine bubble diffusers and decanters with vfds, four (4) 110 gpm was pumps with vfds and three (3) 470 cfm blowers with vfds, a 2.7 mgd ultraviolet (uv) disinfection system with three banks in series and an electrical building; conversion of two (2) package wastewater treatment plants to aerated sludge holding tanks, installation of two 100 gpm digested sludge was pumps
Town of Bryson City
The proposed project generally includes the expansion of wastewater treatment plant from 0.6 mgd to 0.9 mgd to include replacement of headworks consisting of dual mechanical bar screens each rated for 2. 7 mgd at peak hourly flow, an influent pump station (ips) consisting of three (3) 940 gpm pumps and a 400 kw emergency generator; installation of four (4) 210,000 gallons basin sequence batch reactor (sbr) with fine bubble diffusers and decanters with vfds, four (4) 110 gpm was pumps with vfds and three (3) 470 cfm blowers with vfds, a 2.7 mgd ultraviolet (uv) disinfection system with three banks in series and an electrical building; conversion of two (2) package wastewater treatment plants to aerated sludge holding tanks, installation of two 100 gpm digested sludge was pumps
Posted Date
Sep 8, 2025
Due Date
Oct 30, 2025
Release: Sep 8, 2025
Town of Bryson City
Close: Oct 30, 2025
The proposed project generally includes the expansion of wastewater treatment plant from 0.6 mgd to 0.9 mgd to include replacement of headworks consisting of dual mechanical bar screens each rated for 2. 7 mgd at peak hourly flow, an influent pump station (ips) consisting of three (3) 940 gpm pumps and a 400 kw emergency generator; installation of four (4) 210,000 gallons basin sequence batch reactor (sbr) with fine bubble diffusers and decanters with vfds, four (4) 110 gpm was pumps with vfds and three (3) 470 cfm blowers with vfds, a 2.7 mgd ultraviolet (uv) disinfection system with three banks in series and an electrical building; conversion of two (2) package wastewater treatment plants to aerated sludge holding tanks, installation of two 100 gpm digested sludge was pumps
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Town of Bryson City
The meeting included a public hearing for the 2021-2022 Fiscal Year Budget, action items such as the 2020-2021 Fiscal Year Budget Mod. #2, the 2021-2022 Fiscal Year Budget Adoption, ABC Board Vacancy Approval, and the 2021-2022 Fire Contract with Swain County. Workshop items included a discussion with Gary Hall regarding Franklin Street Road Hazards and a discussion on American Rescue Plan Funds.
The meeting included an action item regarding the approval of the Wastewater Collection & Treatment Systems Interim Asset Inventory, Assessment, and Management Plan.
The workshop included discussion of Swain Chamber Event Street Closure Requests with Karen Proctor, and the 2022-2023 Fiscal Year Budget.
The Town Board of Aldermen held a Public Hearing for CDBG Grant.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Town of Bryson City's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database