Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 6,933 CY excavation, class 10; 16,665 SY subgrade preparation; 15,898 ton subgrade treatment, geogrid; 186 LF removal of known pipe and conduit, HDPE, 2"; 8,440 SY amended topsoil, 8"; 180 tn trench foundation; 370 CY replacement of unsuitable backfill material; 527 LF sanitary sewer gravity main, trenched, PVC, 8"; 70 LF sanitary sewer service stub, PVC, 6"; 530 LF removal of sanitary sewer, VCP 8"; 726 LF storm sewer, trenched, RCP, 15"; 266 LF storm sewer, trenched, RCP, 18"; 749 LF storm sewer, trenched, RCP, 24". See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Pavement reconstruction within the road right-of-way. The scope of work also includes removal of existing sidewalks, installation of new raised concrete sidewalks and asphalt bike lanes, installation of new curb/gutters, removal/replacement of existing curb ramps and driveway aprons, installation of new pavement striping and markers, adjusting manholes/valves frames and covers where needed, removal/replacement of existing drainlines, waterlines and sewer lines, installation of new catch basins and drain manholes, and removal/replacement of signage and posts
Posted Date
Sep 15, 2025
Due Date
Jan 21, 2026
Release: Sep 15, 2025
Close: Jan 21, 2026
Pavement reconstruction within the road right-of-way. The scope of work also includes removal of existing sidewalks, installation of new raised concrete sidewalks and asphalt bike lanes, installation of new curb/gutters, removal/replacement of existing curb ramps and driveway aprons, installation of new pavement striping and markers, adjusting manholes/valves frames and covers where needed, removal/replacement of existing drainlines, waterlines and sewer lines, installation of new catch basins and drain manholes, and removal/replacement of signage and posts
AvailableCheltenham Township is seeking sealed bids online for intersection improvements at Chelten Hills Drive and Whitewood Road. The project involves furnishing and installing curb ramps, sidewalks, pavement, signage, and pavement markings. Full project details are available in the bid documents and plans.
Posted Date
Dec 12, 2025
Due Date
Jan 21, 2026
Release: Dec 12, 2025
Close: Jan 21, 2026
Cheltenham Township is seeking sealed bids online for intersection improvements at Chelten Hills Drive and Whitewood Road. The project involves furnishing and installing curb ramps, sidewalks, pavement, signage, and pavement markings. Full project details are available in the bid documents and plans.
AvailableThe City of Marion, Arkansas is soliciting sealed bids for the Woodland View Drive Drainage Improvements 2026 project. Bids will be received at the owners office at City Hall, 13 Military Road, and opened publicly at the stated date and time. Contract documents may be examined at Bond Consulting Engineers East, Inc., and copies are available upon payment as stated in the advertisement; the City reserves the right to waive informalities or reject any or all bids.
Posted Date
-
Due Date
Jan 6, 2026
Close: Jan 6, 2026
The City of Marion, Arkansas is soliciting sealed bids for the Woodland View Drive Drainage Improvements 2026 project. Bids will be received at the owners office at City Hall, 13 Military Road, and opened publicly at the stated date and time. Contract documents may be examined at Bond Consulting Engineers East, Inc., and copies are available upon payment as stated in the advertisement; the City reserves the right to waive informalities or reject any or all bids.
Project consists of construction: 1,439 LF 8" PVC water .ain; 77 LF 6" PVC Water Main; 7 EA 8" Valve & Box; 4EA 6" valve & box; 4 EA 6" hydrant, complete; 5008 SY remove pavement complete; 1590 SY 8" aggregate base; 627 TON HMA, 4EL, wearing 2" 942 TON HMA, 3EL, base 3"; 2LS traffic control; 2 LS pavement markings; 2 LS soil erosion and sedimentation control; 2 LS cleanup.
Posted Date
Dec 16, 2025
Due Date
Jan 22, 2026
Release: Dec 16, 2025
Close: Jan 22, 2026
Project consists of construction: 1,439 LF 8" PVC water .ain; 77 LF 6" PVC Water Main; 7 EA 8" Valve & Box; 4EA 6" valve & box; 4 EA 6" hydrant, complete; 5008 SY remove pavement complete; 1590 SY 8" aggregate base; 627 TON HMA, 4EL, wearing 2" 942 TON HMA, 3EL, base 3"; 2LS traffic control; 2 LS pavement markings; 2 LS soil erosion and sedimentation control; 2 LS cleanup.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis