Higher EducationLA
Posted
Sep 9, 2026
Oct 7, 2026
Replace Chiller Lomax Hall RFP
Provide replace chiller lomax hall.
Description: The Contractor shall provide one (or two) temporary chiller(s) with chilled water pump(s) capable of meeting at least 90 total tons of chilled water demand. Also, shall provide blank flanges and shut off valves for temporary chiller hookup to chilled water return and supply piping. Shall coordinate with 81 CES Energy EMCS to ensure EMCS control interface is operational per 81 CES Heating, Ventilation, and Air Conditioning (HVAC) maintenance personnel. The existing controls for this building are Metasys by Johnson Controls International (JCI). Shall include surge protection on all new large equipment such as chillers and air handlers. Electrical Power: Existing voltage is 480 V / 3 ph. / 60 Hz. See attached file.
Federal · TX, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from Air Education and Training Command.
Adjacent opportunities open for bidding right now.
Higher EducationLA
Posted
Sep 9, 2026
Oct 7, 2026
Provide replace chiller lomax hall.
Higher EducationLA
Posted
Sep 9, 2026
Oct 7, 2026
Provide replace chiller lomax hall.
Higher EducationTX
Posted
Sep 3, 2026
Sep 18, 2026
This open Invitation for Bid is for Texas A&M University’s rental of chillers and associated accessories, and it is not a grant program. The equipment will support climate-control needs at Texas A&M University campuses in College Station, Texas, with an expected rental period of approximately six months beginning in September 2026. Responses are due September 18, 2026, at 2:00 PM, and bidders must register on the AggieBid platform to submit electronically.
Wisconsin Department of Administration
State AgencyWI
Posted
Sep 8, 2026
Oct 15, 2026
In general, the work consists of: replace water cooled chiller and associated piping connections. Remodel chiller room exhaust system. Add refrigerant monitor.