School DistrictAL
Posted
Oct 22, 2026
Nov 12, 2026
Beverlye HVAC Replacement Project RFP
Work includes removal and replacement of existing HVAC units including associated ductwork, piping, electrical connections, controls, and related work.
Description: Renew and upgrade the HVAC controls serving the Police Department portions of the Borough offices. The existing system is a Trane Odyssey split system, consisting of indoor air-handling unit AHU-2 and rooftop condensing unit CU-2, installed in approximately 2020-2021. The air-handling unit and condensing unit will remain. The project is intended to correct temperature-control deficiencies, replace obsolete and inaccessible controls, improve maintainability, and provide a documented, programmable system for approximately sixteen (16) temperature-control zones, subject to field verification.
City · PA, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
55 days before RFP
Lititz Borough had budgeted $68,000 for Police Department HVAC controls while engineers continued defining the project scope and the start was delayed.
And the last one is the police department HVAC controls. Uh we had budgeted $68,000 for that. The scope of work has been complicated. Um that's led to more time with engineers um trying to figure out exactly how we're going to attack this. Um end of the day, if we do get some invoices in this year, it could be in December or maybe even into the next fiscal…
Lititz Borough Council Council Meeting
Board meeting · Jul 28, 2026
Board meeting
27 days before RFP
Lititz Borough Council approved advertising bidding for Police Department HVAC Controls.
SUB-COMMITTEE ON BUILDINGS & GROUNDS Advertise bidding for Police Department HVAC Controls Upon presentation, Meck moved, Bergman seconded to advertise bidding for the Police Department HVAC Controls. Motion carried unanimously.
Lititz Borough Council Meeting Minutes
Board meeting · Aug 25, 2026
RFP published
Proposals due (7 days left)
Adjacent opportunities open for bidding right now.
School DistrictAL
Posted
Oct 22, 2026
Nov 12, 2026
Work includes removal and replacement of existing HVAC units including associated ductwork, piping, electrical connections, controls, and related work.
Pennsylvania Department of Transportation
State AgencyPA
Posted
-
May 1, 2027
Preliminary engineering services for the PA 72/Lititz Road Intersection project, including project management, surveys, environmental studies, and drainage design.
CityCA
Posted
Oct 16, 2026
Nov 10, 2026
Adding a supplemental HVAC system for the administrative areas on the building's second floor, as well as replacing the supplemental HVAC system that serves the dispatch area.
CountyFL
Posted
-
Nov 12, 2026
Palm Beach County is requesting sealed bids from qualified contractors under its annual HVAC services contract for the Supervisory of Elections HVAC Replacement Project. The work is to replace air-handling and humidity-control units at the Supervisory of Elections facility. Bidders must attend the mandatory pre-bid meeting on October 15, 2026, and bids are due November 12, 2026, at 2:00 p.m.
Decision makers connected to this RFP from Borough of Lititz.