Open RFP

Litchfield, City of Wastewater Treatment Facility Improvements 0W1.125117

Description: 1.Construction of new influent lift station and new utility water lift station. 2.Construction of new pretreatment building with fine screening, vortex grit removal, flow measurement and sampling. 3.Construction of three new 50-foot primary clarifiers 4.Replacement of aeration piping and diffusers. 5.Construction of new rapid mix and flocculation basins with attached chemical and electrical building and Construction of new digester electrical building. 6. Rehabilitation of existing anaerobic digesters.The work includes installing new heat exchangers, sludge transfer pumps, and a new jet mixing system. 7.Demolition of existing DAF equipment and construction of new SAF system. 8.Rehabilitation and demolition of various structures.

Buyer
City of Litchfield

City · MN, US

Released
Sep 18, 2026
Closes
Oct 29, 2026(33 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts