Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Evaluate the existing traffic volumes (AADTs) and access spacing. Evaluate the existing bicycle and pedestrian infrastructure in the study area and identify potential gaps and deficiencies.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Evaluate the existing traffic volumes (aadts) and access spacing; evaluate the existing bicycle and pedestrian infrastructure in the study area and identify potential gaps and deficiencies.
Posted Date
Oct 17, 2025
Due Date
Feb 5, 2026
Release: Oct 17, 2025
Close: Feb 5, 2026
Evaluate the existing traffic volumes (aadts) and access spacing; evaluate the existing bicycle and pedestrian infrastructure in the study area and identify potential gaps and deficiencies.
AvailableDesign professional services for transportation study review troost ave..
Posted Date
Dec 30, 2025
Due Date
Jan 30, 2026
Release: Dec 30, 2025
Close: Jan 30, 2026
Design professional services for transportation study review troost ave..
AvailableProvide Geist Road Chena Pump Road Corridor Study.
Posted Date
Dec 31, 2025
Due Date
Feb 6, 2026
Release: Dec 31, 2025
Close: Feb 6, 2026
Provide Geist Road Chena Pump Road Corridor Study.
AvailableWork includes rehabilitation of corridor. Replace and realign 1,155 lf sewer main and 167 lf of water main. 48 ea adjust existing monument cover, water valve box and cleanouts to grade; 22 ea adjust existing manhole to grade; 660 cy soil excavation (planting areas); 17,600 sf remove existing concrete flatwork; 28,230 sf remove existing asphalt concrete; 2,435 lf remove existing concrete curb and gutter; 1 ea remove existing catch basin and portion of 15" storm drain; 1 ls remove existing hand rail; 1 ls remove and reinstall existing pedestrian barricade; 1 ls utility clearances; 1 ls clearing and grubbing; 5 ea tree removal, group a; 7 ea tree removal, group b; 1 ea tree removal, group c; 520 cy import topsoil (planting areas). See outside link.
Posted Date
Jan 7, 2026
Due Date
Jan 27, 2026
Release: Jan 7, 2026
Close: Jan 27, 2026
Work includes rehabilitation of corridor. Replace and realign 1,155 lf sewer main and 167 lf of water main. 48 ea adjust existing monument cover, water valve box and cleanouts to grade; 22 ea adjust existing manhole to grade; 660 cy soil excavation (planting areas); 17,600 sf remove existing concrete flatwork; 28,230 sf remove existing asphalt concrete; 2,435 lf remove existing concrete curb and gutter; 1 ea remove existing catch basin and portion of 15" storm drain; 1 ls remove existing hand rail; 1 ls remove and reinstall existing pedestrian barricade; 1 ls utility clearances; 1 ls clearing and grubbing; 5 ea tree removal, group a; 7 ea tree removal, group b; 1 ea tree removal, group c; 520 cy import topsoil (planting areas). See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis