Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of construction of the lift stations 4 & 5 reconstruction. Full replacement of the wet well and valve vault of two lift stations with associated gravity sewer and forcemain improvements, new combination pump control/scada panel, an air release valve replacement, associated pavement replacement and site improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of services for the upgrades of two wastewater pump stations (Pump Stations 4 and 5), including rehabilitation, installation of new pumps, valve vaults, piping, electrical, and instrumentation work in Westport, Washington.
Posted Date
Dec 11, 2025
Due Date
Jan 6, 2026
Release: Dec 11, 2025
Close: Jan 6, 2026
Procurement of services for the upgrades of two wastewater pump stations (Pump Stations 4 and 5), including rehabilitation, installation of new pumps, valve vaults, piping, electrical, and instrumentation work in Westport, Washington.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Upgrade two wastewater pump stations. Pump Station 4 work includes: Rehabilitate and revise existing wet well; install new submersible pumps, valve vault, and saddle manhole. Pump Station 5 work includes: Modify existing wet well to serve as an influent manhole; install a new wet well with submersible pumps, valve vault, 12" gravity sewer line between the new wet well and the influent manhole; 12" culvert to allow storm drainage in ditch. Work at both pump stations includes all associated piping, electrical, instrumentation, bypass pumping, and other temp measures.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
Upgrade two wastewater pump stations. Pump Station 4 work includes: Rehabilitate and revise existing wet well; install new submersible pumps, valve vault, and saddle manhole. Pump Station 5 work includes: Modify existing wet well to serve as an influent manhole; install a new wet well with submersible pumps, valve vault, 12" gravity sewer line between the new wet well and the influent manhole; 12" culvert to allow storm drainage in ditch. Work at both pump stations includes all associated piping, electrical, instrumentation, bypass pumping, and other temp measures.
AvailableSan Antonio Water System is soliciting a Formal Invitation for Bid for an annual contract to provide lawn maintenance services at SAWS lift stations. A mandatory pre‑bid conference will be held on January 14, 2026 at 10:30 a.m. CT at SAWS Headquarters, with an optional site visit thereafter. Bids are due January 22, 2026 at 3:00 p.m. CT via the SAWS IonWave e‑procurement portal.
Posted Date
Dec 19, 2025
Due Date
Jan 22, 2026
Release: Dec 19, 2025
Close: Jan 22, 2026
San Antonio Water System is soliciting a Formal Invitation for Bid for an annual contract to provide lawn maintenance services at SAWS lift stations. A mandatory pre‑bid conference will be held on January 14, 2026 at 10:30 a.m. CT at SAWS Headquarters, with an optional site visit thereafter. Bids are due January 22, 2026 at 3:00 p.m. CT via the SAWS IonWave e‑procurement portal.
AvailableWork includes parking lot 5 reconstruction. New asphalt parking lot with pavement markings. Project will also include subsurface drainage and site lighting.
Posted Date
Dec 12, 2025
Due Date
Jan 20, 2026
Release: Dec 12, 2025
Close: Jan 20, 2026
Work includes parking lot 5 reconstruction. New asphalt parking lot with pavement markings. Project will also include subsurface drainage and site lighting.