Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Upgrade two wastewater pump stations. Pump Station 4 work includes: Rehabilitate and revise existing wet well; install new submersible pumps, valve vault, and saddle manhole. Pump Station 5 work includes: Modify existing wet well to serve as an influent manhole; install a new wet well with submersible pumps, valve vault, 12" gravity sewer line between the new wet well and the influent manhole; 12" culvert to allow storm drainage in ditch. Work at both pump stations includes all associated piping, electrical, instrumentation, bypass pumping, and other temp measures.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes demolition and replacement of the roofs at three critical water pump stations.
Posted Date
Oct 25, 2025
Due Date
Dec 13, 2025
Release: Oct 25, 2025
Close: Dec 13, 2025
Work includes demolition and replacement of the roofs at three critical water pump stations.
AvailablePremium
Access the largest public sector contact database
Lump-sum construction services to upgrade three pump stations (Gretel Terrace, Denkers Drive, Settlers Lane) including replacement of pump guide rails/adapters/discharge piping, level sensing instrumentation, pump station control panels, integration with Town SCADA, miscellaneous electrical upgrades, and site restoration. Requires NY prevailing wage compliance, 5% bid security, and 100% performance and payment bonds.
Posted Date
Nov 26, 2025
Due Date
Dec 17, 2025
Release: Nov 26, 2025
Close: Dec 17, 2025
Lump-sum construction services to upgrade three pump stations (Gretel Terrace, Denkers Drive, Settlers Lane) including replacement of pump guide rails/adapters/discharge piping, level sensing instrumentation, pump station control panels, integration with Town SCADA, miscellaneous electrical upgrades, and site restoration. Requires NY prevailing wage compliance, 5% bid security, and 100% performance and payment bonds.
AvailableUpgrades To the Pump and Water Treatment Facility. PLC & SCADA System Upgrade Project.
Posted Date
Nov 26, 2025
Due Date
Dec 31, 2025
Release: Nov 26, 2025
Close: Dec 31, 2025
Upgrades To the Pump and Water Treatment Facility. PLC & SCADA System Upgrade Project.
AvailableSealed-bid construction for upgrades to two wastewater pump stations: replacement of pumps and discharge piping, addition of standby generators, new control panels and canopies, sitework, and associated pump station work. Requires Municipal and Public Works contractor license for bids ≥ $50,000, bid bond (5%), performance and payment bonds (100%), compliance with Davis‑Bacon and other federal CDBG‑DR requirements, 240-calendar-day completion, and active UEI prior to award.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
Sealed-bid construction for upgrades to two wastewater pump stations: replacement of pumps and discharge piping, addition of standby generators, new control panels and canopies, sitework, and associated pump station work. Requires Municipal and Public Works contractor license for bids ≥ $50,000, bid bond (5%), performance and payment bonds (100%), compliance with Davis‑Bacon and other federal CDBG‑DR requirements, 240-calendar-day completion, and active UEI prior to award.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis